Line 10: Line 10:
 
*** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
 
*** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
 
*** Two modules fixed during the accelerator maintenance day [https://logbooks.jlab.org/entry/4351422]
 
*** Two modules fixed during the accelerator maintenance day [https://logbooks.jlab.org/entry/4351422]
**** ECAL scalers after maintenance day [https://logbooks.jlab.org/entry/4352367]
+
**** ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [https://logbooks.jlab.org/entry/4352367]
 
*** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528]  [https://logbooks.jlab.org/entry/4350730]
 
*** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528]  [https://logbooks.jlab.org/entry/4350730]
 
* Updates on current run
 
* Updates on current run

Revision as of 11:24, 10 April 2025

Connection

Meeting time and location:

Agenda

    • ECAL maintenance and performance
      • Issue with the FCAL HV module [1]
      • Flash ADC scalers during first beam [2]
      • Two modules fixed during the accelerator maintenance day [3]
        • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
      • Commissioning of the ECAL trigger [5] [6]
  • Updates on current run
    • Monitoring
    • Calibrations
  • Restoring PS test setup [7]