Difference between revisions of "JEF meeting, February 7, 2025"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 40: | Line 40: | ||
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ||
'''Calibrations''' | '''Calibrations''' | ||
− | - | + | - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/02_07_2025/slides_2025.2.7.pdf Update on calibration with cosmic ray] -- Zhikun |
''' Abstract for the SPIE conference | ''' Abstract for the SPIE conference | ||
'''Preparations for readiness review''' | '''Preparations for readiness review''' | ||
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6723 FCAL2 software] -- Simon | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6723 FCAL2 software] -- Simon |
Revision as of 10:26, 7 February 2025
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
- -New LMS light source is ready [1]. Will be installed and checked during next week. Parts for holding reference PMTs are ready.
-Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
- Implementing ECAL into the GlueX DAQ [2]
- - Six VTPs have been installed, firmware loaded
- - Testing GTP trigger using individual ECAL VXS crates [3]
- Commissioning the entire detector using the LMS (signal waveforms)
- ECAL HV interlock check [6]
- HV module failed during cosmic run [7]
- Tuning HV settings [8]
- Material in front of the ECAL, TOF absorber [9][10]
- Temperature scan in the ECAL divider region [11][12][13]
- Preparing for the run -- Sasha
- Page for shift Takers
- ECAL in the Experimental Safety Assessment Document (ESAD)
- EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)
Restoring PS test setup [19]
- Working on the plan for testing calorimeter prototype
ECAL commissioning -- Sasha, All Calibrations
- Update on calibration with cosmic ray -- Zhikun
Abstract for the SPIE conference Preparations for readiness review
- FCAL2 software -- Simon