Line 24: Line 24:
 
* Update mapping of the ECAL high voltages and spare HV cables [https://logbooks.jlab.org/entry/4325047]
 
* Update mapping of the ECAL high voltages and spare HV cables [https://logbooks.jlab.org/entry/4325047]
 
* Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region
 
* Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region
* Toook cosmic data with the whole detector powered [https://logbooks.jlab.org/entry/4324767]
+
* Toook cosmic data with the entire detector powered [https://logbooks.jlab.org/entry/4324767]
 
* Temperature of the ECAL modules
 
* Temperature of the ECAL modules
 
:: Previous temperature scan in the ECAL divider region [https://logbooks.jlab.org/entry/4320981][https://logbooks.jlab.org/entry/4321406][https://logbooks.jlab.org/entry/4321241][https://logbooks.jlab.org/entr /4321188][https://logbooks.jlab.org/entry/4324242?destination=node/1397299]
 
:: Previous temperature scan in the ECAL divider region [https://logbooks.jlab.org/entry/4320981][https://logbooks.jlab.org/entry/4321406][https://logbooks.jlab.org/entry/4321241][https://logbooks.jlab.org/entr /4321188][https://logbooks.jlab.org/entry/4324242?destination=node/1397299]

Revision as of 09:21, 10 January 2025

Connection

Meeting time and location:


Agenda

Preparation of parts for ECAL -- Sasha

-New PCB and parts for the LMS light source arrived to the lab. The LMS board will be assembled and tested during next week.
-Consider to install two more temperature sensors (will try to fix the old ones first), a few sensors have been ordered

-Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

  • Implementing ECAL into the GlueX DAQ [1]
- Initial version of the VTP firmware ready. Started testing using a setup with one VTP during the holiday break (some progress has been made)
- VTPs installed on all ECAL VXS crates [2]
- Use new version of DAQ, VTP included as a DAQ component. Will be updated on the entire detector after the ECAL commissioning
  • ECAL HV interlock check [3]
-Replace one HV module (problems with the interlock) [9]
  • Update signal translation table [10]
  • Update mapping of the ECAL high voltages and spare HV cables [11]
  • Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region
  • Toook cosmic data with the entire detector powered [12]
  • Temperature of the ECAL modules
Previous temperature scan in the ECAL divider region [13][14][15]/4321188[16]
  • Safety documents and preparing for the run
Page for shift Takers
ECAL in the Experimental Safety Assessment Document (ESAD)
EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)

ECAL commissioning -- Sasha, All

Calibrations

  • Gain calibration
  • Low-level timing
  • Timing with respect to other detectors

Analysis/Simulation