Difference between revisions of "JEF meeting, January 10, 2025"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 23: Line 23:
 
* Update signal translation table [https://logbooks.jlab.org/entry/4324793]
 
* Update signal translation table [https://logbooks.jlab.org/entry/4324793]
 
* Update mapping of the ECAL high voltages and spare HV cables [https://logbooks.jlab.org/entry/4325047]
 
* Update mapping of the ECAL high voltages and spare HV cables [https://logbooks.jlab.org/entry/4325047]
 
+
* Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region
* Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region [https://logbooks.jlab.org/entry/4318704]
+
 
* Toook cosmic data with the whole detector powered [https://logbooks.jlab.org/entry/4324767]
 
* Toook cosmic data with the whole detector powered [https://logbooks.jlab.org/entry/4324767]
 +
* Temperature of the ECAL modules
 +
:: Previous temperature scan in the ECAL divider region [https://logbooks.jlab.org/entry/4320981][https://logbooks.jlab.org/entry/4321406][https://logbooks.jlab.org/entry/4321241][https://logbooks.jlab.org/entr /4321188][https://logbooks.jlab.org/entry/4324242?destination=node/1397299]
  
* Temperature scan in the ECAL divider region [https://logbooks.jlab.org/entry/4320981][https://logbooks.jlab.org/entry/4321406][https://logbooks.jlab.org/entry/4321241][https://logbooks.jlab.org/entr /4321188][https://logbooks.jlab.org/entry/4324242?destination=node/1397299]
 
:: Meeting with Tim, additional fans will be installed
 
* Repairing a few ECAL LMS optical fibers [https://logbooks.jlab.org/entry/4320978][https://logbooks.jlab.org/entry/4321408]
 
* Preparing for the installation of the insulation on the detector face
 
:: - Removing Tedlar from the face of the detector [https://logbooks.jlab.org/entry/4321573]
 
:: - ECAL flash ADC scalers before removing detector face cover [https://logbooks.jlab.org/entry/4321569]
 
  
 
* Preparing for the run -- Sasha
 
* Preparing for the run -- Sasha
Line 39: Line 34:
 
:: EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)
 
:: EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)
 
* [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings]
 
* [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings]
* Remaining installation tasks
 
::  - Installing additional fans (will be installed today)
 
::  - Installing insulation on the detector's face (done)
 
 
'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]  
 
'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]  
  
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 
  
 
'''Calibrations'''
 
'''Calibrations'''

Revision as of 09:16, 10 January 2025

Connection

Meeting time and location:


Agenda

Preparation of parts for ECAL -- Sasha

-New PCB and parts for the LMS light source arrived to the lab. The LMS board will be assembled and tested during next week.
-Consider to install two more temperature sensors (will try to fix the old ones first), a few sensors have been ordered

-Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

  • Implementing ECAL into the GlueX DAQ [1]
- Initial version of the VTP firmware ready. Started testing using a setup with one VTP during the holiday break (some progress has been made)
- VTPs installed on all ECAL VXS crates [2]
- Use new version of DAQ, VTP included as a DAQ component. Will be updated on the entire detector after the ECAL commissioning
  • ECAL HV interlock check [3]
-Replace one HV module (problems with the interlock) [9]
  • Update signal translation table [10]
  • Update mapping of the ECAL high voltages and spare HV cables [11]
  • Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region
  • Toook cosmic data with the whole detector powered [12]
  • Temperature of the ECAL modules
Previous temperature scan in the ECAL divider region [13][14][15]/4321188[16]


  • Preparing for the run -- Sasha
Page for shift Takers
ECAL in the Experimental Safety Assessment Document (ESAD)
EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)

Restoring PS test setup [17]

ECAL commissioning -- Sasha, All

Calibrations

  • Gain calibration
  • Low-level timing
  • Timing with respect to other detectors

Analysis/Simulation