* Update signal translation table [https://logbooks.jlab.org/entry/4324793] | * Update signal translation table [https://logbooks.jlab.org/entry/4324793] | ||
* Update mapping of the ECAL high voltages and spare HV cables [https://logbooks.jlab.org/entry/4325047] | * Update mapping of the ECAL high voltages and spare HV cables [https://logbooks.jlab.org/entry/4325047] | ||
− | + | * Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region | |
− | * Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region | + | |
* Toook cosmic data with the whole detector powered [https://logbooks.jlab.org/entry/4324767] | * Toook cosmic data with the whole detector powered [https://logbooks.jlab.org/entry/4324767] | ||
+ | * Temperature of the ECAL modules | ||
+ | :: Previous temperature scan in the ECAL divider region [https://logbooks.jlab.org/entry/4320981][https://logbooks.jlab.org/entry/4321406][https://logbooks.jlab.org/entry/4321241][https://logbooks.jlab.org/entr /4321188][https://logbooks.jlab.org/entry/4324242?destination=node/1397299] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* Preparing for the run -- Sasha | * Preparing for the run -- Sasha | ||
Line 39: | Line 34: | ||
:: EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236) | :: EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236) | ||
* [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings] | * [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings] | ||
− | |||
− | |||
− | |||
'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | '''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ||
− | |||
'''Calibrations''' | '''Calibrations''' |
Revision as of 09:16, 10 January 2025
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
- -New PCB and parts for the LMS light source arrived to the lab. The LMS board will be assembled and tested during next week.
- -Consider to install two more temperature sensors (will try to fix the old ones first), a few sensors have been ordered
-Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
- Implementing ECAL into the GlueX DAQ [1]
- - Initial version of the VTP firmware ready. Started testing using a setup with one VTP during the holiday break (some progress has been made)
- - VTPs installed on all ECAL VXS crates [2]
- - Use new version of DAQ, VTP included as a DAQ component. Will be updated on the entire detector after the ECAL commissioning
- ECAL HV interlock check [3]
- -Replace one HV module (problems with the interlock) [9]
- Update signal translation table [10]
- Update mapping of the ECAL high voltages and spare HV cables [11]
- Implement ECAL HV interlock based on the newly installed temperature sensors in the divider region
- Toook cosmic data with the whole detector powered [12]
- Temperature of the ECAL modules
- Preparing for the run -- Sasha
- Page for shift Takers
- ECAL in the Experimental Safety Assessment Document (ESAD)
- EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)
Restoring PS test setup [17]
ECAL commissioning -- Sasha, All
Calibrations
- Gain calibration
- Low-level timing
- Timing with respect to other detectors
Analysis/Simulation