Difference between revisions of "JEF meeting, November 15, 2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 53: Line 53:
 
:: [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/11_08_2024  Update from Zhikun]
 
:: [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/11_08_2024  Update from Zhikun]
 
<!-- :: [https://halldweb.jlab.org/DocDB/0066/006667/001/Update-Oct17.pdf Laveen Update] -->
 
<!-- :: [https://halldweb.jlab.org/DocDB/0066/006667/001/Update-Oct17.pdf Laveen Update] -->
 +
 +
=Minutes=
 +
Attendees: Bill, Igal, Liping, Sasha, Zhikun, Laveen, Phil, Jane, Vlad, Axel, Olga, S.T.
 +
* No change in delivery date for HV boxes
 +
** Mounting location to be determined
 +
** Installation in December?
 +
* Still working on increasing light output for LMS
 +
** Increase number of LEDs to 25 in existing design
 +
* Working on improving fan implementation to reduce heat in ECAL divider region
 +
** Some regions where air flow is low increase to >125F when the dividers are at HV
 +
** Heat can transfer from PMT divider region to crystals
 +
** Decreasing chiller temperature did not obviously change the temperature profile
 +
** Receiving new/bigger fans will take about 2-3 weeks
 +
* Some fibers delivering small amount of light, added additional fibers to faces of some crystals
 +
** After fixing a few, decided to move forward with sealing the front face of the FCAL
 +
* Laveen presented COMCAL drawings for reference PMT apparatus, to be modified for ECAL
 +
** Need to add soft iron housing
 +
** Also working on restoring TAC (had used Crytur crystals, now using SICCAS crystals)
 +
* Zhikun showed results of looking at data from cosmic runs
 +
** Holes seen that were fixed over the course of multiple runs over several days
 +
** Fit pulse integral distributions with Landau+polynomial background
 +
** Also looked at peak positions using amplitudes
 +
** Found mean values, see variations from channel to channel due to fixed 1040 V high voltage setting for all channels
 +
** Plan to adjust HV settings and check with more cosmic runs

Latest revision as of 08:21, 19 November 2024

Connection

Meeting time and location:


Agenda

Preparation of parts for ECAL -- Sasha

Expected delivery date of the ECAL HV distribution boards 11/18/2024 [1][2]
Meeting with Fernando and Chris regarding updating the LMS light source, a few new LEDs have been ordered

Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

  • Implementing ECAL into the GlueX DAQ [3]
- rocecal3 crate was fixed [4] (initial DAQ implementation [5])
- implementing flash ADC scalers [6][7]
- translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [8]
- implementing and verifying ECAL LMS trigger [9]
- implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [10]
- Start implementing VTP trigger modules. Requires modification of firmware. The trigger crates may be unavailable for 1 - 1.5 months.
- The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now
- New version of DAQ, VTP included as a DAQ component [11]
Meeting with Tim, additional fans will be installed
  • Repairing a few ECAL LMS optical fibers [27][28]
  • Preparing for the installation of the insulation on the detector face
- Removing Tedlar from the face of the detector [29]
- ECAL flash ADC scalers before removing detector face cover [30]
- Installing additional fans
- Installing insulation on the detector's face

Restoring PS test setup [31]

ECAL commissioning -- Sasha, All

Laveen update[[32]]

Calibrations

-First look on cosmic data -- Zhikun

Analysis/Simulation

Update from Zhikun

Minutes

Attendees: Bill, Igal, Liping, Sasha, Zhikun, Laveen, Phil, Jane, Vlad, Axel, Olga, S.T.

  • No change in delivery date for HV boxes
    • Mounting location to be determined
    • Installation in December?
  • Still working on increasing light output for LMS
    • Increase number of LEDs to 25 in existing design
  • Working on improving fan implementation to reduce heat in ECAL divider region
    • Some regions where air flow is low increase to >125F when the dividers are at HV
    • Heat can transfer from PMT divider region to crystals
    • Decreasing chiller temperature did not obviously change the temperature profile
    • Receiving new/bigger fans will take about 2-3 weeks
  • Some fibers delivering small amount of light, added additional fibers to faces of some crystals
    • After fixing a few, decided to move forward with sealing the front face of the FCAL
  • Laveen presented COMCAL drawings for reference PMT apparatus, to be modified for ECAL
    • Need to add soft iron housing
    • Also working on restoring TAC (had used Crytur crystals, now using SICCAS crystals)
  • Zhikun showed results of looking at data from cosmic runs
    • Holes seen that were fixed over the course of multiple runs over several days
    • Fit pulse integral distributions with Landau+polynomial background
    • Also looked at peak positions using amplitudes
    • Found mean values, see variations from channel to channel due to fixed 1040 V high voltage setting for all channels
    • Plan to adjust HV settings and check with more cosmic runs