(Connection)
(Connection)
Line 13: Line 13:
 
'''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All
 
'''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All
 
* Installation of the light distribution board of the ECAL LMS [https://logbooks.jlab.org/entry/4317207]
 
* Installation of the light distribution board of the ECAL LMS [https://logbooks.jlab.org/entry/4317207]
::  - Vlad P. has slightly modified the design of the LMS light source in order to increase the amount of light. We'll start tested the new version during next or following week.
+
::  - Vlad P. has slightly modified the design of the LMS light source in order to increase the amount of light. Chris S. is working on a new board with 9 LEDs.  
 
* Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928]
 
* Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928]
 
:: - rocecal3 crate was fixed [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928])
 
:: - rocecal3 crate was fixed [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928])

Revision as of 09:26, 25 October 2024

Connection

Meeting time and location:

Preparation of parts for ECAL -- Sasha

  • - HV distribution boards [1][2]
- Connectors and cables were installed on the PCBs of 2 HV distribution boards. Sammy and Chris are working on the third board, it will likely be ready during next week (Sammy also works on GEM/TRD)
- Boxes for HV boards have been just been ordered. Expected delivery date 11/15/2024.
- Vince P. has machined parts for two temporary distribution boards. Two temporary HV distribution boards were assembled. The holes for connectors were too narrow, the tech group fixed it.
- Have received all parts for the new version of the LMS light source

Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

  • Installation of the light distribution board of the ECAL LMS [3]
- Vlad P. has slightly modified the design of the LMS light source in order to increase the amount of light. Chris S. is working on a new board with 9 LEDs.
  • Implementing ECAL into the GlueX DAQ [4]
- rocecal3 crate was fixed [5] (initial DAQ implementation [6])
- implementing flash ADC scalers [7][8]
- translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [9]
- implementing and verifying ECAL LMS trigger [10]
- implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [11]
- Start implementing VTP trigger modules. Requires modification of firmware. The trigger crates may be unavailable for 1 - 1.5 months.
- The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now
- Connecting cooling pipes to the ECAL fan (done by tech group)
- Installing dark room ceiling and insulation inside the room, required for cooling test (almost complete)
- Test cooling system (in progress, almost complete)
- Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)

Restoring PS test setup [20]

ECAL commissioning -- Sasha, All

Calibrations

Analysis/Simulation

Laveen Update

Presentation at IEEE [21]

Conference trip was not supported by Hall D

Agenda

  • Preparation of parts for ECAL -- Sasha
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
  • Restoring PS test setup [22]
  • ECAL commissioning -- Sasha, All
  • Calibrations
  • Analysis/Simulation