*'''Preparation of parts for ECAL''' -- Sasha  
 
*'''Preparation of parts for ECAL''' -- Sasha  
 
** - HV long cable: Sammy and Mindy have to assemble 10 cables  
 
** - HV long cable: Sammy and Mindy have to assemble 10 cables  
** - HV distribution boards. Chris has completed the design of the HV distribution boards. We met with Chris, Tim, and Scot regarding location of the boards on the detector frame  
+
** - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg]
 +
** - Fix front panel of two LV distribution boards, re-install the boards on the detector frame [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg]
 
** - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
 
** - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
 
<!-- **  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] -->
 
<!-- **  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] -->
Line 12: Line 13:
 
** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx]
 
** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx]
 
** Installation of HV cables [https://logbooks.jlab.org/entry/4313492][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_02_2024]
 
** Installation of HV cables [https://logbooks.jlab.org/entry/4313492][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_02_2024]
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4314109]
+
::: - two remaining bundle of cables will be ready in about a week
 +
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4314504]
 
** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667]
 
** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667]
 
** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759]
 
** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759]

Revision as of 09:18, 9 August 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable: Sammy and Mindy have to assemble 10 cables
    • - HV distribution boards [1][2]
    • - Fix front panel of two LV distribution boards, re-install the boards on the detector frame [3]
    • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • Report from students [4]
    • Installation of HV cables [5][6]
- two remaining bundle of cables will be ready in about a week
  • Students -- Sasha
    • - Expect one student from Wuhan, paperwork is in process.
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • Analysis/Simulation