Difference between revisions of "July 9, 2024 KLONG KPT post Review Design Meeting"
From GlueXWiki
(→Meeting Time and Place) |
(→Meeting Time and Place) |
||
Line 1: | Line 1: | ||
== Meeting Time and Place == | == Meeting Time and Place == | ||
− | + | Tuesday July 9, 2024, 1:30pm | |
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard, Amaryan Moskov | * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard, Amaryan Moskov |
Revision as of 10:16, 9 July 2024
Meeting Time and Place
Tuesday July 9, 2024, 1:30pm
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard, Amaryan Moskov
Agenda
- Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_18,_2024_KLONG_KPT_post_Review_Design_Meeting
- Discuss changes made as a result of the review last fall to prepare for procurements
- link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page
Minutes/Actions
- Tungsten absorber changed from 15.2 cm square to 14.2 cm square
- Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)
- Kapton is good for 6x10^9 RADS
- Is there enough space for a profiler and active collimator?
- Assume current AC and new profiler
- Bring AC and profiler 3D models into existing KPT model (Keith)
- Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)
- Need to address thermal fatigue of tungsten and beryllium by June (Tim)
- The review recommended an FMEA be performed for system failures such as cooling and power (Tim)
- Need to develop a plan for decommissioning and design but not procure the needed items (Tim)
- Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly
- Hall A had some experience with tungsten heating
- We need to make sure RADCON approves the current design (Hovanes)
- Need to reissue overall layout for review (Keith)