Difference between revisions of "Apr 2, 2009 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Documents to Review) |
||
Line 18: | Line 18: | ||
= Documents to Review= | = Documents to Review= | ||
− | # Fiber Summaries | + | # Fiber Summaries (JLab) |
+ | #* [[Media:Light_output.png|Kuraray measurements of light output]] | ||
+ | #* [[Media:Atten.png|Kuraray measurements of attenuation length]] | ||
+ | # Fiber Measurements | ||
+ | #* [[Kuraray Fibre Tests| Kuraray Fibre Tests - Regina]] | ||
= Tentative Agenda = | = Tentative Agenda = |
Revision as of 09:49, 1 April 2009
Teleconference Time: 4:45 p.m. EST
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Review options for import/export to Chile (loans, donations, transfers, etc.)
- From stand-alone MC, or previous notes, collect the distribution of photons expected for numbers of photons for various showers (especially at low energies, e.g. 50 MeV - 200 MeV) and typicall positions (i.e angles) along the calorimeter. (Andrei).
- JLab to have some informal discussions on various cooling concepts to be presented at the next meeting.
Documents to Review
- Fiber Summaries (JLab)
- Fiber Measurements
Tentative Agenda
- Announcements
- FCAL Update
- Simulations
- BCAL Dark Hits (Matt)
- BCAL Update
- Preparations for construction
- Results of Fiber Tests
- Cooling of BCAL Readout
- Review of Action Items