Difference between revisions of "Electronics"
(→Electronics Subsystems) |
(→Electronics Subsystems) |
||
Line 152: | Line 152: | ||
> '''TD''' - Trigger Distribution [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1018 TD Module] | > '''TD''' - Trigger Distribution [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1018 TD Module] | ||
> '''TS''' - Trigger Supervisor [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1020 TS Module] | > '''TS''' - Trigger Supervisor [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1020 TS Module] | ||
− | > [[Electronics | + | > [[Electronics Trigger_Meetings|Minutes]] |
* '''Environmental Monitoring''' | * '''Environmental Monitoring''' | ||
> Temperature | > Temperature |
Revision as of 09:28, 26 March 2009
Contents
Scope of Electronics Effort
The Electronics Working Group (EWG) is responsible for all the electronics instrumentation in Hall D at Jefferson Lab. The EWG tasks are to:
1. Design, procure and commission all the electronics instrumentation by working in close collaboration with all the detector and support groups and the GlueX collaboration members towards the successful construction and operation of Hall D.
2. Support the R&D efforts for all the detector subsystems.
3. Disseminate information by providing documentation necessary for the successful integration of the detector, instrumentation and readout electronics.
4. Provide for a safe work environment by effectively communicating and implementing all the safety standards and requirements at Jefferson Lab.
- Site maintained by F.J. Barbosa. For additional information, barbosa@jlab.org or (757) 269-7433
Reviews & Meetings
- Reviews
Calorimeter Review - 19-20 February 2008 Review Site
Drift Chamber & PID Review - 27-28 March 2008 Review Site
System & Integration Review - 7-9 May 2008 Review Site
CD-3 Lehmann Review - 22-24 July 2008 - Aproved
- Meetings
Status of Electronics
N.B.: The estimated availability dates that are provided here should be used for guidance only and are not to be considered as firm delivery dates, unless otherwise noted.
ASIC (GAS-) V1 - Testing V2 - June 2009 Preamp Card (GPC-) V1 - Testing V2 - July 2009 Tagger (TAG) Analog Board V1 - Testing V2 - May 2009 Digital Board V1 - Jan 2009 V2 - Pair Spectrometer (PS) Start Counter (ST) Central Drift Chamber (CDC) HVB V1 - Complete V2 - Testing Forward Drift Chamber (FDC) HVTB V1 - Testing V2 - STB V1 - Testing V2 - Cathode Foils V1 - Sep 2008 V2 - RigiFlex Signal V1 - Testing V2 - Jan 2009 RigiFlex Ground V1 - Testing V2 - Jan 2009 Barrel Calorimeter (BCAL) SiPM V1 - Dec 2008 V2 - Time-of-Flight (TOF) Forward Calorimeter (FCAL) Cockcroft-Walton Multiplier V1 - Testing V2 -
fADC125 - 125 MSPS flash ADC V1 - Mar 2009 V2 - fADC250 - 250 MSPS flash ADC V1 - Testing V2 - Nov 2009 F1TDC - 60/120 ps Multi-hit TDC V1 - Complete Oct 2002 V2 - Sept 2009
Trigger Interface (TI) V1 - Testing (TI/TD) V2 - Signal Distribution (SD) V1 - Jan 2009 V2 - Crate Trigger Processor (CTP) V1 - Jan 2009 V2 - Sub-System Processor (SSP) V1 - May 2009 V2 - Global Trigger Processor (GTP) V1 - Jul 2009 V2 - Trigger Supervisor (TS) V1 - Jun 2009 V2 - Trigger Distribution (TD) V1 - Apr 2009 V2 -
Infrastructure Links
- Hall D Electronics Overview GlueX-doc-1040
- Summary of Hall D Detector Systems - Electronics channel counts, etc. maintained by Fernando, GlueX-doc-747
- Hall D Complex Final Drawings (25 Feb 2008) - From landscaping to electrical details Hall D Complex
- Hall D Space Program Design Criteria (July 2007) - Additional construction details Hall D Complex II
Electronics Subsystems
- Grounding and Shielding
> Grounding and Shielding Guidelines GlueX-doc-1029
- System Diagrams
> Hall D Readout Electronics GlueX-doc-1035
- Detector & Electronics
> CDC & FDC - Electrical Characterization GlueX-doc-1131, HVB GlueX-doc-1179, Calibration GlueX-doc-1185, > ASIC - GAS-1 Description, Tests, Status & Plans GlueX-doc-1005 > Preamp Card - GPC-01 Pinout GlueX-doc-826, Tests GlueX-doc-871, GlueX-doc-931, User's Manual GlueX-doc-923, Readout System Tests GlueX-doc-1065 > SiPM > PMTs > STBs, HVTBs, HVBs
- Modular Electronics
> Discriminators (LE, CFD) LE V895, CFD V812 > Scalers Struck SIS3800s
- Readout Electronics
> F1TDC F1TDC User's Manual, IEEE NSS 2002 Poster > fADC125 Short Spec Sheet, Module Specifications > fADC250 Short Spec Sheet, IEEE NSS Paper, IEEE NSS Poster
- L1 Trigger Electronics
> Trigger Overview L1 Trigger Overview, Trigger Timing, Fixed Latency Trigger > Trigger System Diagrams Diagrams > SD - Signal Distribution SD Module > CTP - Crate Trigger Processor CTP Module,IEEE NSS Paper, IEEE NSS Poster > TI - Trigger Interface TI Module > SSP - Sub-System Processor SSP Module > GTP - Global Trigger Processor GTP Module > TD - Trigger Distribution TD Module > TS - Trigger Supervisor TS Module > Minutes
- Environmental Monitoring
> Temperature > Humidity > Cooling Systems
- Power Systems & Controls
> AC > HV Modules CAEN A1932A 48Ch 3KV Module > LV Modules Wiener MPOD LV Modules, CAEN LV Module,MPOD Tests GlueX-doc-1080 > High Voltage Distribution .CDC & FDC - GlueX-doc-967 > Low Voltage Distribution .CDC & FDC - GlueX-doc-966 > Control Interfaces
- Crates & Racks
> High Voltage Chassis CAEN SY1527 > Low Voltage Chassis Wiener MPOD, CAEN SY1527 > VME Chassis CAEN VME64x, Wiener VME64x, Wiener 20-slot VXS > Racks Typical 19" Rack 77"x23"x36" (303x91x142 mm) > VME64x & VXS Backplane VME Pin Allocation
- Signal Integrity and Cable Systems
> Signal Cables .CDC and FDC - Measurements GlueX-doc-660, Specs GlueX-doc-995 > Connectors > Splitters > HV > LV > Controls > Interfaces
- Safety
> Standards & Guidelines 6200-JLab Electrical Safety Program, 6210-General Electrical Safety, Appendix 6210-T1, Appendix 6210-T2, Appendix 6210-T4, 6220-AC Electrical Distribution, Appendix 6220-T1, 6230-Electronic Equipment Safety, 6240-Electrical Equipment Construction > Monitoring > Interlocks