Difference between revisions of "GlueX Start Counter Meeting, October 30, 2023"
From GlueXWiki
(→Agenda) |
(→Minutes) |
||
Line 22: | Line 22: | ||
== Minutes == | == Minutes == | ||
− | present: | + | present: Vivian, Eugene, Hovanes, Beni |
− | + | ||
+ | Vivian: presented her work on the Start Counter timing calibration for some run during last years PrimeX run period run 111370. The notes and progress on this work can be found [ here] | ||
== Action Items == | == Action Items == |
Revision as of 10:19, 30 October 2023
GlueX Start Counter Meeting
Monday, October 30, 2023
9:00 am EDT
Meeting information: https://jlab-org.zoomgov.com/j/1604147172?pwd=QjRtMDRRQ0lVNW5oVVA0VmFMSnh1dz09
Benedikt Zihlmann is inviting you to a scheduled ZoomGov meeting.
Topic: Start Counter
Contents
Agenda
- Start Counter status:
- Start_Counter_Operations
- Geometry: SC match to tracks
- Preparation for next year's running
- FADC250_READ_THR 120: (Runs 41384, 120848) needs to be higher, 20 ADC counts above base line is too low. Full scale of 4096 bits is 500mV with a base line around 100 leads to 500mV/(4096-100) = 0.12mV / ADC count: So a setting of 20 ADC counts above base line corresponds to only 2.5mV
- DSC2_THRESHOLD 50 60: this corresponds to 50mV for discriminator threshold setting.
- while adc readout threshold is clearly set too low the discriminator threshold may be too high. Need to find compromise and better match.
Minutes
present: Vivian, Eugene, Hovanes, Beni
Vivian: presented her work on the Start Counter timing calibration for some run during last years PrimeX run period run 111370. The notes and progress on this work can be found [ here]
Action Items
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2023
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2023/ .