Difference between revisions of "Controls Meeting 28-Sep-2023"
From GlueXWiki
Line 2: | Line 2: | ||
* Solenoid status | * Solenoid status | ||
** PXI spare controller procurement (Brian) | ** PXI spare controller procurement (Brian) | ||
− | * Atmospheric pressure sensors (Bobby | + | * Atmospheric pressure sensors (Bobby) |
* FCAL-2 chiller controls (Scot, Bobby) | * FCAL-2 chiller controls (Scot, Bobby) | ||
* FCAL-2 sensors (Bobby) | * FCAL-2 sensors (Bobby) |
Revision as of 14:44, 26 September 2023
- Announcements
- Solenoid status
- PXI spare controller procurement (Brian)
- Atmospheric pressure sensors (Bobby)
- FCAL-2 chiller controls (Scot, Bobby)
- FCAL-2 sensors (Bobby)
- FCAL-2 voltage controls (Hovanes)
- CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby)
- Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
- New NMR probe (Scot)
- Switch in the tagger hall (Hovanes)
- Other items
Time/Location
10:00am Thursday 28-September-2023