(Created page with "* Announcements * Solenoid status ** PXI spare controller procurement (Brian) * Atmospheric pressure sensors (Bobby, Brian) * FCAL chiller controls (Scot, Bobby) * CAEN HV c...") |
|||
Line 5: | Line 5: | ||
* FCAL chiller controls (Scot, Bobby) | * FCAL chiller controls (Scot, Bobby) | ||
* CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby) | * CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby) | ||
+ | * Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby) | ||
+ | * New NMR probe (Scot) | ||
* Switch in the tagger hall (Hovanes) | * Switch in the tagger hall (Hovanes) | ||
* Other items | * Other items |
Revision as of 14:36, 26 September 2023
- Announcements
- Solenoid status
- PXI spare controller procurement (Brian)
- Atmospheric pressure sensors (Bobby, Brian)
- FCAL chiller controls (Scot, Bobby)
- CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby)
- Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
- New NMR probe (Scot)
- Switch in the tagger hall (Hovanes)
- Other items
Time/Location
10:00am Thursday 28-September-2023