Difference between revisions of "Baby BCAL at JLab Photos"
From GlueXWiki
(→Module Assignment) |
(→Module Assignment) |
||
Line 30: | Line 30: | ||
! Direction | ! Direction | ||
! Module Picture | ! Module Picture | ||
+ | ! Bias Voltage (module) | ||
|- | |- | ||
| Upstream 49 | | Upstream 49 | ||
Line 35: | Line 36: | ||
| South | | South | ||
| [[File:MiniBCAL-South.jpeg|400px|thumb]] | | [[File:MiniBCAL-South.jpeg|400px|thumb]] | ||
+ | | 75 V | ||
|- | |- | ||
| Downstream 49 | | Downstream 49 | ||
Line 40: | Line 42: | ||
| North | | North | ||
| [[File:MiniBCAL-North.jpeg|400px|thumb]] | | [[File:MiniBCAL-North.jpeg|400px|thumb]] | ||
+ | | 74 V | ||
|} | |} | ||
Latest revision as of 15:59, 17 August 2023
Contents
PS Test Stand Setup (March 2023)
The baby BCAL was set up on the test bench. Downstream is defined as the North end and the Upstream is defined as the South End
Cable stretching
The North and south end cables were grouped together and stretched across cables crates over to the DAQ.
Module Assignment
Module Name | HV/LV BCAL Distribution Box | Direction | Module Picture | Bias Voltage (module) |
---|---|---|---|---|
Upstream 49 | South | 75 V | ||
Downstream 49 | |
North | 74 V |
Wrapping the BCAL
The baby BCAL was wrapped in black Tedlar after mounting the SiPM modules and connecting the LEMO output cables. After wrapping the BCAL was covered using a black cloth to make it light tight
DAQ Crate assignment
The output channels from the baby BCAL is connected to the following fADC crates.
Data Streaming
The way the mini BCAL is set up Sector 3 (index from 1) is hit the most that can be seen from the Scalars