Difference between revisions of "Run Planning Meeting Notes, March 15 - March 22, 2023"
From GlueXWiki
(→Past 24 hours) |
(→Reports) |
||
Line 35: | Line 35: | ||
*[https://logbooks.jlab.org/entry/4149857 PS/PSC conic scalar rate: run period so far] | *[https://logbooks.jlab.org/entry/4149857 PS/PSC conic scalar rate: run period so far] | ||
--> | --> | ||
+ | |||
+ | [https://logbooks.jlab.org/entry/4150494#comment-44083 Summary of > 480 nA current running this period (60% of 24 hours utilized to this point)] | ||
+ | [https://logbooks.jlab.org/entry/4150233 Summary of trigger threshold scan and 1 billion events collected at 900 nA] | ||
+ | |||
===Issues=== | ===Issues=== | ||
<!-- | <!-- |
Revision as of 09:00, 16 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394 MCC Whiteboard Hall D counting room white board Spreadsheet with list of runs Integrated Trigger Count Hall D Logbook
Contents
Thursday March 16
Past 24 hours
- Tagger Hall Access requested by Hovanes
- came as a surprise to RADCON and MCC crew
- discussion during the 8:00 meeting
- we can do better
- High current run(900 nA)
Shift Reports
Reports
Summary of > 480 nA current running this period (60% of 24 hours utilized to this point) Summary of trigger threshold scan and 1 billion events collected at 900 nA
Issues
Plans
- Continue running production
- Visitors tour of Hall D starts at 4:45pm 3/16
- Data collection should end sometime after 4:00pm, when convenient before 4:20
- Contact MCC and ask to drop Hall D to RESTRICTED, tagger hall not affected
- Ask them to contact RADCON to sweep Hall D for the visit
- Visit should end by 6:45pm
- As soon as they leave, put Hall D back in Power Permit and request beam restoration
- Start off with new harp scans, then continue production
- Straight-track run ~50nA
- planned for March 19th Sunday swing
- magnetic field ramped down
- access not required
- people to contact: Justin, Sasha, Lubomir, Naomi
Plans on Accelerator Side
- Hall C running continues, no apparent issues that might interrupt them before Monday
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)