(→Wrapping the BCAL) |
(→DAQ Crate assignment) |
||
Line 53: | Line 53: | ||
== DAQ Crate assignment == | == DAQ Crate assignment == | ||
+ | |||
+ | The output channels from the mini BCAL is connected to the following fADC crates | ||
+ | |||
+ | {| class="wikitable" | ||
+ | |- | ||
+ | ! [[File:MiniBCAL-OutputCrate.jpeg|300px|thumb|center|fADC output crate]] | ||
+ | ! [[File:MiniBCAL-OutputCrate1.jpeg|300px|thumb|center|fADC output crate]] | ||
+ | ! [[File:MiniBCAL-OutputCrate2.jpeg|300px|thumb|center|fADC output crate]] | ||
+ | |} |
Revision as of 17:14, 6 March 2023
Contents
mini BCAL Setup at Hall-D
The mini BCAL was set up on the test bench. Downstream is defined as the North end and the Upstream is defined as the South End
Cable stretching
The North and south end cables were grouped together and stretched across cables crates over to the DAQ.
Module Assignment
Module Name | HV/LV Input Channel | Direction | After Cabling |
---|---|---|---|
Module 49 Upstream | J7 | South | |
Module 49 Downstream |
J8 | North |
Wrapping the BCAL
The mini BCAL was wrapped in black Tedlar after mounting the SiPM modules and connecting the LEMO output cables. After wrapping the BCAL was covered using a black cloth to make it light tight
DAQ Crate assignment
The output channels from the mini BCAL is connected to the following fADC crates