Difference between revisions of "Tracking-1-19-2023"
From GlueXWiki
(→Minutes) |
(→Minutes) |
||
Line 12: | Line 12: | ||
= Minutes = | = Minutes = | ||
+ | # CDC - The max current CDC may have during the high-intensity test is 1 uA per straw, i.e. < 20 uA for the inner HV channels. | ||
# FDC - the problem with half amplitudes in the FDC was solved - bad LV connector on the patch panel. Now using a spare connector but need to fix it after the end of the run. | # FDC - the problem with half amplitudes in the FDC was solved - bad LV connector on the patch panel. Now using a spare connector but need to fix it after the end of the run. | ||
# GEM-TRD - the readout foil that was shipped from CERN to Australia finally arrived at the right destination - UVa. They will continue with the assembly of the large scale prototype beginning of February and promise to be ready second half of Feb. | # GEM-TRD - the readout foil that was shipped from CERN to Australia finally arrived at the right destination - UVa. They will continue with the assembly of the large scale prototype beginning of February and promise to be ready second half of Feb. |
Revision as of 11:14, 26 January 2023
Thu 1/19/2023 2pm
Agenda
- Detector status:
- CDC
- FDC
- Tracking
- GEM-TRD
- Other
Minutes
- CDC - The max current CDC may have during the high-intensity test is 1 uA per straw, i.e. < 20 uA for the inner HV channels.
- FDC - the problem with half amplitudes in the FDC was solved - bad LV connector on the patch panel. Now using a spare connector but need to fix it after the end of the run.
- GEM-TRD - the readout foil that was shipped from CERN to Australia finally arrived at the right destination - UVa. They will continue with the assembly of the large scale prototype beginning of February and promise to be ready second half of Feb.