(Created page with "= Wednesday January 18 = === Past 24 hours === * Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and came back at ***: ABU= *** h for the day...") |
(→Wednesday January 18) |
||
Line 1: | Line 1: | ||
− | = | + | = Thursday January 19 = |
=== Past 24 hours === | === Past 24 hours === | ||
* Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and came back at ***: ABU= *** h for the day | * Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and came back at ***: ABU= *** h for the day | ||
Line 24: | Line 24: | ||
* Hall in controlled access? | * Hall in controlled access? | ||
* Diamond alignment: Thursday evening/Friday day ? | * Diamond alignment: Thursday evening/Friday day ? | ||
+ | * [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023#Runplan Link to runplan] |
Revision as of 18:04, 18 January 2023
Thursday January 19
Past 24 hours
- Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and came back at ***: ABU= *** h for the day
- refilled the target around 4:15pm.
- Several accesses done during the day:
- Scott
- Sergey
- David Lawrence
- Cody
Shift Reports
- Day shift summary
- Swing shift summary
- [ Owl shift summary]
- [ Early Riser shift summary]
Reports
Issues
Plans
- Beam off all day for RF study day until 4pm?
- Hall in controlled access?
- Diamond alignment: Thursday evening/Friday day ?
- Link to runplan