Difference between revisions of "Run Planning Meeting Notes, November 24 - November 30, 2022"
From GlueXWiki
(→Shift Summaries) |
(→Issues) |
||
Line 24: | Line 24: | ||
=== Issues === | === Issues === | ||
− | + | ||
* [https://logbooks.jlab.org/entry/4090024 One Ar cylinder is empty] | * [https://logbooks.jlab.org/entry/4090024 One Ar cylinder is empty] | ||
+ | * [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew) | ||
=== Shift Summaries === | === Shift Summaries === |
Revision as of 08:22, 24 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Our next planned meeting is on Monday Nov 28
The plan
- Continue production running at 200nA with a full target until further notice (after the weekend).
Achievements
- Production running with full target.
- Filled the target on Wednesday morning after approximately 2B triggers with empty target.
- Raw mode cosmics run 111571 (Beni)
- FCAL base changed (Malte)
- Several locked up FCAL bases reset Wed early riser Wed day
Issues
- One Ar cylinder is empty
- Reconstructed Beam Energy monitoring plot discrepancy in recent runs (Drew)
Shift Summaries
- Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.