Difference between revisions of "Run Planning Meeting Notes, Novemver 17 - Novemver 23, 2022"
From GlueXWiki
(→Shift Summary) |
(→Shift Summary) |
||
Line 17: | Line 17: | ||
=== Shift Summary === | === Shift Summary === | ||
− | * [0400-1000 18/11] | + | * [https://logbooks.jlab.org/entry/4086248 0400-1000 18/11] |
* [https://logbooks.jlab.org/entry/4086165 2200-0400 17-18/11] | * [https://logbooks.jlab.org/entry/4086165 2200-0400 17-18/11] | ||
* [https://logbooks.jlab.org/entry/4086001 1600-2200 17/11] | * [https://logbooks.jlab.org/entry/4086001 1600-2200 17/11] |
Revision as of 07:30, 18 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Friday, November 18
Past 24 hours
- xB collected (111480-present)
- 2hrs lost due to RF
- xhrs lost because Hall A spin dance
Shift Summary
Issues/Reports
- FCAL base lockup
- 3.83B collected since the start of this Full target cycle (111456-present)
Plan
- Take Full target data until 13B triggers reached
- Acc. White Board, no maintenance scheduled for next week
- Priority to Hall C until 24/11
- Priority to Hall A 25/11 to ??/??
Thursday, November 17
Past 24 hours
- 2.8B collected (111460-present)
- 2hrs lost because of DAQ issue
Shift Summary
Issues/Reports
- Non regular beam energy (Keigo/Victor)
- FCAL base lock
- CDC IA was not turned on after the target was filled (Ellie/Thomas)
- DAQ issue (Sergey/Ellie/Thomas)
- 3.83B collected since the start of this Full target cycle (111456-present)
Plan
- Take Full target data until 12B triggers reached(?)
- Expect downtimes and unstable beam due to Hall A spin dance & 70uA beam
- Acc. White Board, no maintenance scheduled for next week
- Priority to Hall C until 24/11
- Priority to Hall A 25/11 to ??/??