Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"
From GlueXWiki
(→Past 24 hours) |
(→Issues/Reports) |
||
Line 24: | Line 24: | ||
=== Issues/Reports === | === Issues/Reports === | ||
* [https://logbooks.jlab.org/entry/4075373 FCAL voltage issue and bases replacement] (Malte) | * [https://logbooks.jlab.org/entry/4075373 FCAL voltage issue and bases replacement] (Malte) | ||
+ | * Simon was not authorized to add logbook entries when logged into the logbook on gluon02 (??) | ||
=== Plan === | === Plan === |
Revision as of 08:33, 3 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Wednesday, November 3
Past 24 hours
- Maintenance day. Got Beam Back in the Swing shift.
- Harp scans after beam returned. [1] [2]
- Full target production all night whenever we had beam.
- Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.
Shift Summary
Issues/Reports
- FCAL voltage issue and bases replacement (Malte)
- Simon was not authorized to add logbook entries when logged into the logbook on gluon02 (??)
Plan
- 9:30 am Empty target, then start production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)