Difference between revisions of "JEF meeting, October 28, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 5: | Line 5: | ||
=Agenda= | =Agenda= | ||
− | * Moving JEF hardware reports to CALWG | + | * Moving JEF hardware reports to CALWG? |
* Simulations/Analysis | * Simulations/Analysis | ||
*Preparation of parts for FCAL2 modules -- Sasha | *Preparation of parts for FCAL2 modules -- Sasha |
Revision as of 09:26, 28 October 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Moving JEF hardware reports to CALWG?
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Order 25 CRYTUR crystals (Total 1613 + 25 = 1638)
- Wrapped CRYTUR crystals: 727
- Available for wrapping: 762 - 727 = 25 (10 crystals were wrapped during last week)
- DSG group continues wrapping (Mindy)
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1313 (10 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 737 CRYTUR, available: 25
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Light Monitoring System -- Arshak