Difference between revisions of "JEF meeting, October 21, 2022"
From GlueXWiki
m (→Agenda) |
(→Agenda) |
||
Line 6: | Line 6: | ||
* Simulations/Analysis | * Simulations/Analysis | ||
− | + | ||
+ | Preparation of parts for FCAL2 modules -- Sasha | ||
+ | ** Order 25 CRYTUR crystals (Total 1613 + 25 = 1638) | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 727 (10 since last week) ] | ||
+ | *** Available for wrapping: 762 - 727 = 35 | ||
+ | *** DSG group continues wrapping | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
+ | ** Fabricated modules: <span style="color:#FF0000"> Total 1298 </span> (7 modules fabricated since last week) | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 722 CRYTUR], available: 40 | ||
* Updates from the FCAL installation meetings with Tim's group -- Sasha | * Updates from the FCAL installation meetings with Tim's group -- Sasha | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/October_05,_2022_FCAL_Insert_Installation_Meeting October 5] | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings] | ||
+ | |||
+ | |||
+ | |||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak | ||
* DNP practice talk: Philip Cole, Engaging Undergraduate Students in Constructing the PbWO4 Calorimeter for the JEF Experiment at JLab | * DNP practice talk: Philip Cole, Engaging Undergraduate Students in Constructing the PbWO4 Calorimeter for the JEF Experiment at JLab |
Revision as of 08:45, 21 October 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
Preparation of parts for FCAL2 modules -- Sasha
- Order 25 CRYTUR crystals (Total 1613 + 25 = 1638)
- Wrapped CRYTUR crystals: 727 (10 since last week)
- Available for wrapping: 762 - 727 = 35
- DSG group continues wrapping
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1298 (7 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 722 CRYTUR, available: 40
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Light Monitoring System -- Arshak
- DNP practice talk: Philip Cole, Engaging Undergraduate Students in Constructing the PbWO4 Calorimeter for the JEF Experiment at JLab