** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today. | ** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today. | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
− | ** Fabricated modules: <span style="color:#FF0000"> Total | + | ** Fabricated modules: <span style="color:#FF0000"> Total 1153 </span> |
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS] | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 544 CRYTUR], Remaining: 133 | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 544 CRYTUR], Remaining: 133 |
Revision as of 23:23, 11 August 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Received 25 crystals from CRYTUR (last from our 2nd order).
- Meeting with the DSG group [1]. Mindy and George will continue working on the project.
- Preparation of parts[2][3][4]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Preparing Silicon cookies
- Module fabrication
- Cleaning brass assemblies
- Gluing light guides
- Wrapped CRYTUR crystals: 684
- All currently available (consider to borrow some spares from NPS)
- Preparation of parts for FCAL2 modules -- Sasha
- Module fabrication -- Sasha
- Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
- Status of fabrication
- Fabricated modules: Total 1153
- All SICCAS 577 SICCAS
- 544 CRYTUR, Remaining: 133
- Clean room EEL126 [5][6]
- Expect to move to the new lab EEL108 (the same building) [7]
- Work on amending safety docs
- Light Monitoring System -- Arshak