=== Shift reports === | === Shift reports === | ||
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4012676 Friday day shift summary] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4012861 Friday swing shift summary] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4012952 Friday owl shift summary] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4013044 Saturday early riser shift summary] |
+ | * [https://logbooks.jlab.org/entry/4013166 Saturday day shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4013264 Saturday swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4013337 Saturday owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4013408 Sunday early riser shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4013486 Sunday day shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4013580 Sunday swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4013649 Sunday owl shift summary] | ||
+ | * [ Monday early riser shift summary] | ||
=== Reports === | === Reports === |
Revision as of 23:52, 10 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Contents
Friday July 8 - Sunday July 10
Past 72 hours
- 6B events on lead have been collected
- DAQ livetime looks much better after switching to writing data in two files simultaneously
- Friday evening harp scan [1] [2] extrapolation
- Sunday morning harp scan 5C11 5C11B [3] extrapolation
- Hall-D strip charts
Shift reports
- Friday day shift summary
- Friday swing shift summary
- Friday owl shift summary
- Saturday early riser shift summary
- Saturday day shift summary
- Saturday swing shift summary
- Saturday owl shift summary
- Sunday early riser shift summary
- Sunday day shift summary
- Sunday swing shift summary
- Sunday owl shift summary
- [ Monday early riser shift summary]
Reports
Issues
Plans
- Continue production on lead
- unmask FCAL modules in the trigger
Thursday July 7
Past 24 hours
- harp scans were done during short beam on period during day-time, some distributions show 1/100 peak/shoulders ratio others 1/10,000 [7] [8]
- Dominion Power's work required a voltage reduction so we had tagger, PS and sweep magnets off for a couple of hours
- collected cosmics and LED runs during daytime, and production on lead (about 8 hrs) during night time
- Beni: beam was quite stable overnight [9]
Shift reports
Reports
- Sasha checked FCAL trigger rate without masking inner layers. Preliminary result for the rate was 14kHz [10]
- Hovanes pointed out, that we don't observe 60Hz oscillations now [11]
Issues
- Problems with running at 30nA on AMO, radiator thickness was reduced to 3*10^-4 this night,
as 4.5*10^-4 was causing IOC trips [12] [13]
- Alexandre just noticed that Tagger magnet NMR communication is down again [14]
- DIRC major alarm has been acknowledged [15], Mark may need to investigate this issue more
- Dave has noticed we have a higher radiation level values now, about factor of 1.5 [16], [17]
- Hydra alarm on fa125_itrig [18]
- daq livetime is uneven from time to time [19]
Plans
- Continue production on lead
- find out the way to unmask FCAL modules
Wednesday, July 6
Past 24 hours
- Malte and Mark worked on FCAL bases replacement [20]
- One of the RF crates had been disconnected, Beni fixed it [21]
- Bobby and others worked in the tagger hall during the day. At 3:30 pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterward, it was still locked on zero and there was still a Comm Status error [22]
- Beni found that the solenoid controls hung, and restarted the ramping, which was helpful.
- Had minor issues with DAQ at 7.00 pm: ROCFDC11 error: timeout error on FA125, every 3 seconds. (fADC125 in fdc11 slot 3 was replaced during daytime [23]) Sergei worked out the DAQ issue at 7.50 pm
- Established operating field of the solenoid at 8:30 pm.
- harp scans are ongoing now
Shift reports
Reports
- Sergey and Lubomir worked in the Hall this night from 10 pm to 11:30 pm [24]
- Hovanes reported his study of the coherent peak position drifts observed on the 4th of July [25]
- Still have 60Hz structure [26]. The situation is improved according to MCC experts.
- CDC HV and TAGM alarms are more frequent now
- CDC gas flow increased [27]
Issues
Plans
- Continue production on lead
- Unmasking FCAL central modules from the trigger needs to be done unless it increases rate too high