Difference between revisions of "CPP and NPP Run Conditions"
From GlueXWiki
Line 10: | Line 10: | ||
| style="text-align:left" | Empty Target || 1.5? || 27 nA || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 |style="text-align:left" | Run at higher current? | | style="text-align:left" | Empty Target || 1.5? || 27 nA || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 |style="text-align:left" | Run at higher current? | ||
|- | |- | ||
− | | style="text-align:left" | Diamond Alignment || 0.5? || 100 nA? || Pb (0.3 mm) || 3.4 mm ||style="text-align:left" | JD70-103 / JD70-107 || | + | | style="text-align:left" | Diamond Alignment || 0.5? || 100 nA? || Pb (0.3 mm) || 3.4 mm ||style="text-align:left" | JD70-103 / JD70-107 |style="text-align:left" | |
|- | |- | ||
| style="text-align:left" | Trigger Commissioning || 1? || 100 nA? || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 | style="text-align:left" | | | style="text-align:left" | Trigger Commissioning || 1? || 100 nA? || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 | style="text-align:left" | | ||
|- | |- | ||
− | | style="text-align:left" | Beam Energy Calibration || 0.5? || 100 nA || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 |style="text-align:left" | Collimator Blocking for 5 min, periodically | + | | style="text-align:left" | Beam Energy Calibration || 0.5? || 100 nA || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 | style="text-align:left" | Collimator Blocking for 5 min, periodically |
|- | |- | ||
| style="text-align:left" | TAC Runs || 1.5? || 27 || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 |style="text-align:left" | | | style="text-align:left" | TAC Runs || 1.5? || 27 || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 |style="text-align:left" | | ||
|} | |} |
Revision as of 08:48, 15 March 2022
Activity | Duration (PAC Days) | Current | Target | Collimator | Radiator | Comment |
---|---|---|---|---|---|---|
Full target (Production) | 20 | 27 nA | Pb (0.3 mm) | 3.4 mm | style="text-align:left" | | |
Empty Target | 1.5? | 27 nA | Pb (0.3 mm) | 3.4 mm | style="text-align:left" | Run at higher current? | |
Diamond Alignment | 0.5? | 100 nA? | Pb (0.3 mm) | 3.4 mm | JD70-103 / JD70-107 |style="text-align:left" | | |
Trigger Commissioning | 1? | 100 nA? | Pb (0.3 mm) | 3.4 mm | style="text-align:left" | | |
Beam Energy Calibration | 0.5? | 100 nA | Pb (0.3 mm) | 3.4 mm | style="text-align:left" | Collimator Blocking for 5 min, periodically | |
TAC Runs | 1.5? | 27 | Pb (0.3 mm) | 3.4 mm | style="text-align:left" | |