Difference between revisions of "JEF meeting, February 11, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 17: | Line 17: | ||
* Data analysis | * Data analysis | ||
* Simulations | * Simulations | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Bill, Olga, Sasha, Jon, Zisis, Arshak, Igal, Liping, Azizah, Tim B., S.T. | ||
+ | * Vacuum chamber and pump ready to be sent to GWU | ||
+ | ** Need to have some fixtures needed for silicon cookie production made, to be ordered by Sasha next week | ||
+ | ** Loan agreement in works | ||
+ | ** Olga to come to lab week of 21st, plan to bring equipment back to GWU | ||
+ | * Detector support group started working on pre-shaping ESR foils, done 36 so far | ||
+ | * Sasha and Arshak working on module construction | ||
+ | ** Finished another 27 for a grand total of 41 | ||
+ | ** Found problems with brazing that need to be addressed | ||
+ | * Arshak working on LMS development -- needs DAQ (we have a working system but it has not been used for a while) |
Revision as of 15:51, 11 February 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- Module fabrication -- Sasha
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
Minutes
Attendees: Bill, Olga, Sasha, Jon, Zisis, Arshak, Igal, Liping, Azizah, Tim B., S.T.
- Vacuum chamber and pump ready to be sent to GWU
- Need to have some fixtures needed for silicon cookie production made, to be ordered by Sasha next week
- Loan agreement in works
- Olga to come to lab week of 21st, plan to bring equipment back to GWU
- Detector support group started working on pre-shaping ESR foils, done 36 so far
- Sasha and Arshak working on module construction
- Finished another 27 for a grand total of 41
- Found problems with brazing that need to be addressed
- Arshak working on LMS development -- needs DAQ (we have a working system but it has not been used for a while)