Difference between revisions of "Analysis shift"
From GlueXWiki
Line 1: | Line 1: | ||
− | [https://halldweb.jlab.org/wiki/index.php/Run_Wiki Run Wiki] | + | [https://halldweb.jlab.org/wiki/index.php/Run_Wiki Run Wiki] <br> |
− | [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Run Plan] | + | [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Run Plan] <br> |
+ | [https://halldweb.jlab.org/wiki/index.php/SRC@GlueX#Useful_Links Useful Links] | ||
Note: | Note: |
Revision as of 14:48, 12 November 2021
Run Wiki
Run Plan
Useful Links
Note:
People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
HallD Counting House (join here)
Responsible for:
- Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
- Where to find information to fill the spreadsheet
- Completing data quality run-by-run,
- Checking data coming in from monitoring (plot browser),
- Contacting the appropriate team member if there is a concern with a specific monitoring plot,
- Contact the counting house ( (757)269-5504) )
- Update daily analysis meeting with production runs,
- Update list of production runs at the bottom of this page.
Contents
Calibration
Physics Shift
(Will be merged with Analysis Shift) Responsible for Running Physics Plugins
- (γ,ρ-p) Channel Analysis
- On the ifarm:
- cd /work/halld2/home/src-ct/HallD_SRC-CT_Analysis/analysis_scripts/proton_rhoMinus/
- ./offline_monitoring "Run Number"
- cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/proton_rhoMinus/
- cat counts_081474.txt
- Input that into this spreadsheet
- On the ifarm:
- (γ,ρ0p) Channel Analysis
List of good production runs
- updated until: 90064
- By radiator:
- amorphous radiator: 90034-90039, 90045, 90062
- diamond radiator: 90051, 90059, 90061, 90063-90064
NOTES TO SOLVE (to be edited as they are solved):
- Igal informed (11/11/2021 05:44) that run 90039 is not in the database accesible by the Python script. But it is in the RCDB. (CA)
List of trigger configurations
- FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
- Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
- Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
- Bit 3: PS