Difference between revisions of "Run Planning Meeting Notes, November 11 - November 17, 2021"
From GlueXWiki
(→Friday November 12) |
|||
Line 4: | Line 4: | ||
#* improved convergence: [https://logbooks.jlab.org/entry/3940109 before] and [https://logbooks.jlab.org/entry/3940868 after] | #* improved convergence: [https://logbooks.jlab.org/entry/3940109 before] and [https://logbooks.jlab.org/entry/3940868 after] | ||
#* ... but the transmission went down by ~15% [https://logbooks.jlab.org/entry/3940921], [https://logbooks.jlab.org/entry/3941436] | #* ... but the transmission went down by ~15% [https://logbooks.jlab.org/entry/3940921], [https://logbooks.jlab.org/entry/3941436] | ||
+ | #* ccdb for 9000+ runs [https://logbooks.jlab.org/entry/3941082] | ||
+ | #* TAGH timing offset changed [https://logbooks.jlab.org/entry/3941071] | ||
+ | #* restoring communications with FCAL bases [https://logbooks.jlab.org/entry/3941236] | ||
#Issues: | #Issues: | ||
#* bad f250 in TAGH [https://logbooks.jlab.org/entry/3940210] - no longer an issue (Sasha power-cycled the crate) | #* bad f250 in TAGH [https://logbooks.jlab.org/entry/3940210] - no longer an issue (Sasha power-cycled the crate) | ||
#* transmission - Hovanes will do AC scan when the beam is back after 10am | #* transmission - Hovanes will do AC scan when the beam is back after 10am | ||
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
− | #* Down starting at 10am: for 1+ hours (Hall A changes to 4 passes) | + | #* Down starting at 10am: for 1+ hours (Hall A changes to 4 passes) - FCAL items will be surveyed |
#* Continue production at 150nA on diamond | #* Continue production at 150nA on diamond | ||
# Analysis update | # Analysis update |
Revision as of 09:40, 12 November 2021
Friday November 12
- Last 24h:
- Issues:
- bad f250 in TAGH [6] - no longer an issue (Sasha power-cycled the crate)
- transmission - Hovanes will do AC scan when the beam is back after 10am
- Plan:
- Down starting at 10am: for 1+ hours (Hall A changes to 4 passes) - FCAL items will be surveyed
- Continue production at 150nA on diamond
- Analysis update