Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"
From GlueXWiki
(→Thursday November 04) |
(→Thursday November 04) |
||
Line 2: | Line 2: | ||
[https://bluejeans.com/660743227 Meeting Bluejeans 660743227] | [https://bluejeans.com/660743227 Meeting Bluejeans 660743227] | ||
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-08/index.html Trigger Counter] | [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-08/index.html Trigger Counter] | ||
+ | =Friday November 05= | ||
+ | #Last 24h: | ||
+ | #* Long accelerator down time due to power outage | ||
+ | #* Recorded 150M+ events with full LHe4 target, end of PrimEx | ||
+ | #Issues: | ||
+ | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
+ | #* Beam energy change planned for 11/05-11/07, start Friday ~7am | ||
+ | #** Cancel shifts from Friday 10am? | ||
+ | #** RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall? | ||
+ | #** Safety Walkthrough scheduled for Friday 2pm (Elton) | ||
+ | #** Start SRC/CT on Monday, meeting at same time, but new number: 1234456 | ||
+ | |||
=Thursday November 04= | =Thursday November 04= | ||
#Last 24h: | #Last 24h: |
Revision as of 12:05, 4 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Friday November 05
- Last 24h:
- Long accelerator down time due to power outage
- Recorded 150M+ events with full LHe4 target, end of PrimEx
- Issues:
- Plan:
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- Cancel shifts from Friday 10am?
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- Start SRC/CT on Monday, meeting at same time, but new number: 1234456
- Beam energy change planned for 11/05-11/07, start Friday ~7am
Thursday November 04
- Last 24h:
- Issues:
- CDC HV alarm at 2:45am, restored by itself for all but one channel (F:14), but HV OK, acknowledged
- BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards.
- Plan:
- Continue production at 200nA with the solenoid on
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- Cancel shifts from Friday 10am?
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am