Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"
From GlueXWiki
(→Thursday November 04) |
(→Thursday November 04) |
||
Line 11: | Line 11: | ||
#* Several beam interruptions, currently loss of power, might take a few hours to restore | #* Several beam interruptions, currently loss of power, might take a few hours to restore | ||
#Issues: | #Issues: | ||
− | #* CDC HV alarm at 2:45am, restored by itself for all | + | #* CDC HV alarm at 2:45am, restored by itself for all but '''one''' channel (F:14), but HV OK, acknowledged |
− | #* BCAL LED trigger script was off for runs 81702 and 82703. Switched on. | + | #* BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards. |
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
#* Continue production at 200nA with the solenoid on | #* Continue production at 200nA with the solenoid on | ||
#* Beam energy change planned for 11/05-11/07, start Friday ~7am | #* Beam energy change planned for 11/05-11/07, start Friday ~7am | ||
+ | #** Cancel shifts from Friday 10am? | ||
#** RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall? | #** RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall? | ||
#** Safety Walkthrough scheduled for Friday 2pm | #** Safety Walkthrough scheduled for Friday 2pm | ||
#** EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am | #** EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am |
Revision as of 08:22, 4 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Thursday November 04
- Last 24h:
- Issues:
- CDC HV alarm at 2:45am, restored by itself for all but one channel (F:14), but HV OK, acknowledged
- BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards.
- Plan:
- Continue production at 200nA with the solenoid on
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- Cancel shifts from Friday 10am?
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am