Difference between revisions of "July 08, 2021 KLONG Design Meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 8: | Line 8: | ||
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_10,_2021_KLONG_Design_Meeting | * Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_10,_2021_KLONG_Design_Meeting | ||
* [[Media:KLONG_Be_target_overall.pdf]] | * [[Media:KLONG_Be_target_overall.pdf]] | ||
− | * Existing PS vacuum chamber 5 cm high, entrance tube 3.5 cm round ID | + | * Existing PS vacuum chamber 5 cm high, entrance tube 3.5 cm round ID, magnet gap - 7 cm |
* Tungsten cooling | * Tungsten cooling | ||
* Preliminary 3D Model | * Preliminary 3D Model |
Revision as of 08:43, 8 July 2021
Meeting Time and Place
Thursday July 08, 2021, 1pm Bluejeans https://bluejeans.com/465620466
- Present - Hovanes Egiyan, Moskov Amaryan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Mark Stevens
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_10,_2021_KLONG_Design_Meeting
- Media:KLONG_Be_target_overall.pdf
- Existing PS vacuum chamber 5 cm high, entrance tube 3.5 cm round ID, magnet gap - 7 cm
- Tungsten cooling
- Preliminary 3D Model
- Support/rollers
- Tungsten cooling
- 7 cm tube downstream to allow cooling tubes for tungsten
- Be target holder
- lead geometry
- Borated Poly geometry
- Heat absorbed by Be and Tungsten
- Requirements:
- Cool tungsten plug to below temperature that affects lead (327°C)
- 6 cm beam tube near final target
- Moveable out of beamline