Difference between revisions of "Oct 27, 2008 Calorimetry"
From GlueXWiki
(→Minutes) |
(→Documents to Review) |
||
Line 21: | Line 21: | ||
= Documents to Review= | = Documents to Review= | ||
− | + | # | |
= Tentative Agenda = | = Tentative Agenda = |
Revision as of 13:50, 24 October 2008
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Oct 13 meeting
- Each subsystem must complete blanks in the Calibration Specification Table.
- Decision on Bcal sampling fraction needed if any changes are to be made to design.
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Up-to-date geometry ONGOING.
- Decreased threshold for FM pmts. ONGOING
- Position resolution - understand dependence on granularity.
- Different segmentation for the outer section. - LOWER PRIORITY
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
- Add roadmap for Bcal Roadmap to wiki (Elton)
Documents to Review
Tentative Agenda
- Announcements
- Calibration
- Progress on filling in the Calibration Specification Table.
- Fcal
- Bcal
- Decision on lead thickness -- Updates on sampling studies (Stamatis)
- What is the gain? What needs to be tested if a change is desired?
- Roadmap toward a decision for the Bcal readout
- Updates on resolution studies (Blake)
- Visit to Alberta
- Decision on lead thickness -- Updates on sampling studies (Stamatis)
Minutes
Attending: