Difference between revisions of "April 2, 2021 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Friday April 2, 2021<br> 10:00 am, ET<br> '''Remote only''' == Connection Using Bluejeans == # To join via Polycom room syst...") |
(→Agenda) |
||
Line 22: | Line 22: | ||
#** All strongbacks back from re-anodizing | #** All strongbacks back from re-anodizing | ||
#** Borofloat ordered, scheduling mirror cutting with Danny's and new template | #** Borofloat ordered, scheduling mirror cutting with Danny's and new template | ||
+ | #** New media blasting station in Hall D setup | ||
#* Other thoughts or suggestions? | #* Other thoughts or suggestions? | ||
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) |
Revision as of 16:45, 1 April 2021
Meeting Information
GlueX DIRC Meeting
Friday April 2, 2021
10:00 am, ET
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Mirror prototype test plan (All)
- Discussion of prototypes and ongoing tests (Bill, All)
- Next steps in mirror process: (Justin)
- All strongbacks back from re-anodizing
- Borofloat ordered, scheduling mirror cutting with Danny's and new template
- New media blasting station in Hall D setup
- Other thoughts or suggestions?
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status: all 8 batches nearly complete for REST reconstruction (Justin)
- Geometric reconstruction update
- Cherenkov PDF (Ahmed)
- FastDIRC update (Yunjie)
- AOB