Difference between revisions of "JEF meeting, March 19, 2021"
From GlueXWiki
(Created page with "Meeting time and location= 9:00 am EST (JLab time) Bluejeans only =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jla...") |
|||
Line 25: | Line 25: | ||
* Data analysis | * Data analysis | ||
* Simulations | * Simulations | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Igal,Sasha,Jared,Phil,Susan,Zisis,Varun,Liping,Bill B.,Tim B.,Jon,Jane,S.T. | ||
+ | * No news on SICCAS crystal production, will try to follow up on lead oxide (raw material) issue | ||
+ | * Sasha emailed CRYTUR about crystal production, received response after the meeting: can produce a small amount in fiscal year 2021 | ||
+ | * PMT dividers: Sasha trying to get Vlad P. and Fernando on same page | ||
+ | ** for COMCAL planning to go with divider design with bypassed amplifier, with optional 3x ampliflication | ||
+ | ** Sasha will check Vlad's new design with resistor modifications with LED | ||
+ | ** Need to have ready for COMCAL refurbishment in/by summer | ||
+ | * Do we move forward with idea of replacing Cockroft-Walton for FCAL lead glass blocks? Can make universal base design for all FCAL | ||
+ | * Liping will work on draft memo to management regarding FCAL-II support | ||
+ | ** Try for original 1x1 m^2 insert size? | ||
+ | ** Request more beam time if have to go for smaller insert? | ||
+ | ** Mention upgrades for FCAL-II Lead Glass HV? | ||
+ | * U. Regina student working with Jon on 2 photon generator for testing island algorithm |
Latest revision as of 07:48, 22 March 2021
Meeting time and location= 9:00 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
Minutes
Attendees: Igal,Sasha,Jared,Phil,Susan,Zisis,Varun,Liping,Bill B.,Tim B.,Jon,Jane,S.T.
- No news on SICCAS crystal production, will try to follow up on lead oxide (raw material) issue
- Sasha emailed CRYTUR about crystal production, received response after the meeting: can produce a small amount in fiscal year 2021
- PMT dividers: Sasha trying to get Vlad P. and Fernando on same page
- for COMCAL planning to go with divider design with bypassed amplifier, with optional 3x ampliflication
- Sasha will check Vlad's new design with resistor modifications with LED
- Need to have ready for COMCAL refurbishment in/by summer
- Do we move forward with idea of replacing Cockroft-Walton for FCAL lead glass blocks? Can make universal base design for all FCAL
- Liping will work on draft memo to management regarding FCAL-II support
- Try for original 1x1 m^2 insert size?
- Request more beam time if have to go for smaller insert?
- Mention upgrades for FCAL-II Lead Glass HV?
- U. Regina student working with Jon on 2 photon generator for testing island algorithm