Difference between revisions of "September 28, 2020 DIRC"
From GlueXWiki
(→Agenda) |
|||
Line 22: | Line 22: | ||
#** Production launch at NERSC/PSC ongoing, partially moving back to JLab | #** Production launch at NERSC/PSC ongoing, partially moving back to JLab | ||
#* Geometric reconstruction update (Ahmed/Roman) | #* Geometric reconstruction update (Ahmed/Roman) | ||
− | |||
#** [https://web-docs.gsi.de/~rdzhigad/www/research/delta-time-shift Update on shift of the time difference] | #** [https://web-docs.gsi.de/~rdzhigad/www/research/delta-time-shift Update on shift of the time difference] | ||
#* FastDIRC update (Yunjie) | #* FastDIRC update (Yunjie) |
Revision as of 01:59, 28 September 2020
Meeting Information
GlueX DIRC Meeting
Monday September 28, 2020
1:00 pm, EDT
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Shutdown work planning (Bill)
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status (Justin)
- Production launch at NERSC/PSC ongoing, partially moving back to JLab
- Geometric reconstruction update (Ahmed/Roman)
- FastDIRC update (Yunjie)
- Spring 2020 data production status (Justin)
- Follow-up on additional action items from workfest (All)
- 100M event MC samples required for ρ and φ data/MC comparisons:
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
- 100M event MC samples required for ρ and φ data/MC comparisons:
- AOB