Difference between revisions of "Run Planning Meeting Notes, July 27-August 5, 2020"

From GlueXWiki
Jump to: navigation, search
(July 27th-Aug. 3rd)
Line 2: Line 2:
  
  
== July 27th-Aug. 3rd ==  
+
== July 27th-Aug. 2nd ==  
  
 
*Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.  
 
*Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.  
Line 16: Line 16:
 
**[https://logbooks.jlab.org/entry/3819651 trigger checked out]
 
**[https://logbooks.jlab.org/entry/3819651 trigger checked out]
 
**Radiation level study done.  
 
**Radiation level study done.  
 +
**15 min calibration runs (in long and production mode) done
 
**CDC HV scan ongoing.
 
**CDC HV scan ongoing.
  
Line 22: Line 23:
 
*We often get [https://logbooks.jlab.org/entry/3819644 less beam current than requested]
 
*We often get [https://logbooks.jlab.org/entry/3819644 less beam current than requested]
 
*[https://logbooks.jlab.org/entry/3819644 DAQ start run issue]: reminder of [https://logbooks.jlab.org/entry/3819929 DIRC mis-communication solution]
 
*[https://logbooks.jlab.org/entry/3819644 DAQ start run issue]: reminder of [https://logbooks.jlab.org/entry/3819929 DIRC mis-communication solution]
*[https://logbooks.jlab.org/entry/3819644 Difficulty in setting CDC HV for CDV HV scan], see also [https://logbooks.jlab.org/entry/3819845 Keigo's entry]
+
*[https://logbooks.jlab.org/entry/3819644 Difficulty in setting CDC HV for CDV HV scan], see also [https://logbooks.jlab.org/entry/3819845 Keigo's entry]. It was fixed by rebooting the IOC.
 +
 
 +
Upcoming days:
 +
*[https://upload.wikimedia.org/wikipedia/commons/4/40/NHC_AL092020_5day_cone_no_line_and_wind.png Hurricane/tropical storm Isaias]
 +
*TagM communication issue
 +
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 +
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]
 +
*Thursday: 1->5 pass change for Hall B. Hall A on-line.
 +
*Tuesday 11th: Maintenance day?
 +
 
 +
== Aug. 3rd  ==
 +
 
 +
[https://logbooks.jlab.org/entry/3819971 run plan for today]
 +
 
 +
*Took 1h "production" (with TagM down) amorphous run.
 +
*Hovanes continued the optimization of the transmission.
 +
 
 +
Issues:
 +
*TagM
 +
*Monitoring discrepancy: [https://logbooks.jlab.org/entry/3819988 Hovanes observation], [https://logbooks.jlab.org/entry/3819995 Naomi] and [https://logbooks.jlab.org/entry/3820023 Justin] replies
 +
 
 +
Reports
 +
**Radiation level study
  
 
Upcoming days:
 
Upcoming days:

Revision as of 13:27, 3 August 2020

<- Back to Run coordination meeting page


July 27th-Aug. 2nd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized

Issues:

Upcoming days:

Aug. 3rd

run plan for today

  • Took 1h "production" (with TagM down) amorphous run.
  • Hovanes continued the optimization of the transmission.

Issues:

Reports

    • Radiation level study

Upcoming days: