*Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem. | *Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem. | ||
Line 16: | Line 16: | ||
**[https://logbooks.jlab.org/entry/3819651 trigger checked out] | **[https://logbooks.jlab.org/entry/3819651 trigger checked out] | ||
**Radiation level study done. | **Radiation level study done. | ||
+ | **15 min calibration runs (in long and production mode) done | ||
**CDC HV scan ongoing. | **CDC HV scan ongoing. | ||
Line 22: | Line 23: | ||
*We often get [https://logbooks.jlab.org/entry/3819644 less beam current than requested] | *We often get [https://logbooks.jlab.org/entry/3819644 less beam current than requested] | ||
*[https://logbooks.jlab.org/entry/3819644 DAQ start run issue]: reminder of [https://logbooks.jlab.org/entry/3819929 DIRC mis-communication solution] | *[https://logbooks.jlab.org/entry/3819644 DAQ start run issue]: reminder of [https://logbooks.jlab.org/entry/3819929 DIRC mis-communication solution] | ||
− | *[https://logbooks.jlab.org/entry/3819644 Difficulty in setting CDC HV for CDV HV scan], see also [https://logbooks.jlab.org/entry/3819845 Keigo's entry] | + | *[https://logbooks.jlab.org/entry/3819644 Difficulty in setting CDC HV for CDV HV scan], see also [https://logbooks.jlab.org/entry/3819845 Keigo's entry]. It was fixed by rebooting the IOC. |
+ | |||
+ | Upcoming days: | ||
+ | *[https://upload.wikimedia.org/wikipedia/commons/4/40/NHC_AL092020_5day_cone_no_line_and_wind.png Hurricane/tropical storm Isaias] | ||
+ | *TagM communication issue | ||
+ | *[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart] | ||
+ | *[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ] | ||
+ | *Thursday: 1->5 pass change for Hall B. Hall A on-line. | ||
+ | *Tuesday 11th: Maintenance day? | ||
+ | |||
+ | == Aug. 3rd == | ||
+ | |||
+ | [https://logbooks.jlab.org/entry/3819971 run plan for today] | ||
+ | |||
+ | *Took 1h "production" (with TagM down) amorphous run. | ||
+ | *Hovanes continued the optimization of the transmission. | ||
+ | |||
+ | Issues: | ||
+ | *TagM | ||
+ | *Monitoring discrepancy: [https://logbooks.jlab.org/entry/3819988 Hovanes observation], [https://logbooks.jlab.org/entry/3819995 Naomi] and [https://logbooks.jlab.org/entry/3820023 Justin] replies | ||
+ | |||
+ | Reports | ||
+ | **Radiation level study | ||
Upcoming days: | Upcoming days: |
Revision as of 13:27, 3 August 2020
<- Back to Run coordination meeting page
July 27th-Aug. 2nd
- Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
- Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
- Shift Started on Aug. 1st, 8am.
August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized
- CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.
- Radiation levels are good.
- Beam convergence is good
- Beam position optimized (?), however transmission doesn't appear to be optimal
- trigger checked out
- Radiation level study done.
- 15 min calibration runs (in long and production mode) done
- CDC HV scan ongoing.
Issues:
- TagM
- We often get less beam current than requested
- DAQ start run issue: reminder of DIRC mis-communication solution
- Difficulty in setting CDC HV for CDV HV scan, see also Keigo's entry. It was fixed by rebooting the IOC.
Upcoming days:
- Hurricane/tropical storm Isaias
- TagM communication issue
- Week 1 time chart
- Richard plan for Act. Col. test
- Thursday: 1->5 pass change for Hall B. Hall A on-line.
- Tuesday 11th: Maintenance day?
Aug. 3rd
- Took 1h "production" (with TagM down) amorphous run.
- Hovanes continued the optimization of the transmission.
Issues:
- TagM
- Monitoring discrepancy: Hovanes observation, Naomi and Justin replies
Reports
- Radiation level study
Upcoming days:
- Hurricane/tropical storm Isaias
- TagM communication issue
- Week 1 time chart
- Richard plan for Act. Col. test
- Thursday: 1->5 pass change for Hall B. Hall A on-line.
- Tuesday 11th: Maintenance day?