Difference between revisions of "Run Planning Meeting Notes, Mar 19-Mar 25, 2020"
From GlueXWiki
(→Friday, March 20) |
|||
Line 29: | Line 29: | ||
#* [https://logbooks.jlab.org/entry/3806409 Looks like TAGM disc scaler 21 is dead] | #* [https://logbooks.jlab.org/entry/3806409 Looks like TAGM disc scaler 21 is dead] | ||
#** [https://logbooks.jlab.org/entry/3806470 Turns out this is OK] | #** [https://logbooks.jlab.org/entry/3806470 Turns out this is OK] | ||
+ | # Run Plan | ||
+ | #* Production | ||
+ | |||
+ | |||
+ | == Saturday, March 21 == | ||
+ | # Last 24 hours | ||
+ | #* Completed a full cycle of radiator settings | ||
+ | #* Monitoring: | ||
+ | #** [https://logbooks.jlab.org/entry/3806706 Various issues] | ||
+ | #** [https://logbooks.jlab.org/entry/3806920 RF & TPOL - quite different to reference plots.] | ||
+ | # Reports/Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3806677 DAQ problems] -- Amy | ||
+ | #* [https://logbooks.jlab.org/entry/3806792 8% PS rate decrease over 2-3 hours] -- Elton | ||
+ | #* [https://logbooks.jlab.org/entry/3806886 FDC HV trip] -- | ||
+ | #* [https://logbooks.jlab.org/entry/3806666 Empty target results] -- Simon | ||
+ | #* [https://logbooks.jlab.org/entry/3806738 fadc250 "bad pulse data" bug in earlier 2020 spring data diagnosed, solved] -- Richard | ||
# Run Plan | # Run Plan | ||
#* Production | #* Production |
Revision as of 08:50, 21 March 2020
- Single-person shift schedule in operation, since Tuesday 16:00
- the schedule, linked from main Hall-D web page -- Eugene
- the shift rules, linked from main Hall-D web page -- Eugene
- the shift rules, linked from hdops wiki -- Eugene
- 4-hall video feeds are now available, displayed on screen above copier
- Continuous bluejeans meeting open in counting house -- Needs another connection in order to remain open.
Thursday, March 19
- Last 24 hours
- TAC run -- MCC report
- Reports/Issues
- Transmission is back to higher level -- Alexandre
- BCAL LED triggers missing -- Elton
- Run Plan
- Production
Friday, March 20
- Last 24 hours
- Completed 0/90 PARA, 0/90 PERP, 45/135 PARA, 45/135 PERP, AMO 4.5x10-4, begin 0/90 PARA
- Monitoring Okay [1], [2]
- CDC 2 channel trip on over-current -- Elton
- Later ramp up fine. -- Elton
- BCAL Hot channel fixed by Sergey
- Reports/Issues
- Run Plan
- Production
Saturday, March 21
- Last 24 hours
- Completed a full cycle of radiator settings
- Monitoring:
- Reports/Issues
- DAQ problems -- Amy
- 8% PS rate decrease over 2-3 hours -- Elton
- FDC HV trip --
- Empty target results -- Simon
- fadc250 "bad pulse data" bug in earlier 2020 spring data diagnosed, solved -- Richard
- Run Plan
- Production