Difference between revisions of "2020 Data Production"
From GlueXWiki
(→Overall Calibrations) |
|||
Line 64: | Line 64: | ||
| SC Propagation Time || Rupesh Dotel || | | SC Propagation Time || Rupesh Dotel || | ||
|} | |} | ||
+ | |||
+ | == Reconstruction Checks == | ||
+ | |||
+ | Need to verify that current reconstruction code is performing as well or better than what was used for 2018-01/2018-08-ver02 | ||
== Analyses == | == Analyses == |
Revision as of 13:13, 18 February 2020
Contents
Proposed Schedule
Finalize Calibrations & Performing Monitoring Launch
- Batch 1: April 1st
- Batch 2: April 15st
- Batch 3: ...
Ready for Production
- Batch 1: May 1st
- Batch 2: May 15st
- Batch 3: ...
Run-dependent Calibrations
Calibration | Person | Run Range |
---|---|---|
Overall Timing (first pass) | Sean Dobbs | 71336 - 71557 |
Overall Timing (post-ST updates) | Sean Dobbs | |
CDC wire gains | Naomi Jarvis | 70000 until electronics changes |
CDC overall gains | Naomi Jarvis | 71336 - 71557 |
CDC dE/dx | Naomi Jarvis | |
CDC time-to-distance | Naomi Jarvis | 71336 - 71557 |
PS/PSC Timing | Olga Cortes | |
TAGH timewalks | Olga Cortes | |
TAGM timewalks | Sean Dobbs/Richard Jones | |
TOF | Beni Zihlmann | |
DIRC | Justin Stevens |
Overall Calibrations
Calibration | Person | Status |
---|---|---|
BCAL channel timing | Mark Dalton | |
BCAL attenuation length/gain ratio | Mark Dalton | |
BCAL z-position | Mark Dalton | |
BCAL gains/non-linearities | Karthik Suresh | |
FCAL gains/non-linearities | Colin Gleason | |
FCAL timing | Colin Gleason | |
SC Timewalks | Rupesh Dotel | Done |
SC Propagation Time | Rupesh Dotel |
Reconstruction Checks
Need to verify that current reconstruction code is performing as well or better than what was used for 2018-01/2018-08-ver02