(Created page with "== Thursday, February 13 == # Last 24 hours #* Accelerator down 8:00-noon, hall in controlled access #** Beni went into hall to work on CDC boards #** Radcon released faile...") |
(→Thursday, February 13) |
||
Line 18: | Line 18: | ||
#** after that, diagnosis and repair of PS controller | #** after that, diagnosis and repair of PS controller | ||
#** if all goes well, should be able to start ramp by 5:00pm | #** if all goes well, should be able to start ramp by 5:00pm | ||
− | |||
− | |||
# Reports | # Reports |
Revision as of 09:38, 13 February 2020
Thursday, February 13
- Last 24 hours
- Accelerator down 8:00-noon, hall in controlled access
- Beni went into hall to work on CDC boards
- Radcon released failed goni motor from tagger hall, taken for repair
- start counter dark pulse measurements (raw mode random triggers)
- Lubomir adjusted FDC thresholds
- other activities during controlled access...
- Quick-check harp scan at 12:15pm
- Production started at 12:30pm
- 200M evts collected, 46 minutes ABU
- Solenoid trip at 2:30 -- detailed report from experts
- cause of trip -- over-temperature on PS component
- subsequently discovered -- controller communications issue
- solenoid will not ramp, shifts cancelled until 8:00 2/13
- Hall currently in restricted access
- acid flush of PS cooling loop underway, finished by noon
- after that, diagnosis and repair of PS controller
- if all goes well, should be able to start ramp by 5:00pm
- Accelerator down 8:00-noon, hall in controlled access
- Reports