Difference between revisions of "Feb 6, 2020 Calorimeter"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 44: | Line 44: | ||
## BCAL | ## BCAL | ||
# Calibrations | # Calibrations | ||
− | ## [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4321 Toy MC to study non-linearities] | + | ## [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4321 Toy MC to study non-linearities] (Elton) |
# Monitoring | # Monitoring | ||
− | # Reconstruction | + | # Reconstruction |
+ | #* Announcement at Production and Analysis meeting. Complete calibrations by April 1. | ||
# Efficiencies | # Efficiencies | ||
# Simulations | # Simulations |
Revision as of 16:13, 5 February 2020
Meeting Time: 11:00 a.m.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Contents
Participant Direct Lines
- JLab Phone in CC L207 is 757-269-7084 (usual room)
- JLab Phone: in CC F326 is 757-269-6460
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
References
- FCAL HDFCAL log book
- BCAL HDBCAL log book
Goals for Calorimetry Group
- Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
- Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at east 5 MeV.
- Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.
Action Items
- Ship back bases to IU that fail repair (Colin)
- Check that the 4ns shifts in the BCAL FADCs is absent with the new firmware (Mark)
- Complete Calorimeter work packages
Tentative Agenda
- Announcements
- Collaboration Meeting February 13-15, 2020.
- Action Items
- Run Updates
- FCAL
- BCAL
- Calibrations
- Toy MC to study non-linearities (Elton)
- Monitoring
- Reconstruction
- Announcement at Production and Analysis meeting. Complete calibrations by April 1.
- Efficiencies
- Simulations
- NIM articles
- Any other business
Minutes
Attending: