Difference between revisions of "Run Planning Meeting Notes, Jan 30-Feb 05, 2020"
From GlueXWiki
m |
m |
||
Line 21: | Line 21: | ||
#** No beam 4pm-9pm (lost vacuum in Hall C transport [https://logbooks.jlab.org/entry/3774952]) | #** No beam 4pm-9pm (lost vacuum in Hall C transport [https://logbooks.jlab.org/entry/3774952]) | ||
#* Saturday: | #* Saturday: | ||
− | #** Goniometer stopped moving sometime between 5am and 3pm. The problem was only noticed at 3pm. | + | #** Goniometer stopped moving sometime between 5am and 3pm. The problem was only noticed at 3pm. As a result, a number of runs with unknown diamond orientation [https://logbooks.jlab.org/entry/3775587],[https://logbooks.jlab.org/entry/3775590] |
− | #** Repair work on goniometer | + | #** Repair work on goniometer since 4pm (no beam) [https://logbooks.jlab.org/entry/3775592] |
# Changes | # Changes | ||
#* Change in TPOL readout [https://logbooks.jlab.org/entry/3774906] | #* Change in TPOL readout [https://logbooks.jlab.org/entry/3774906] |
Revision as of 19:45, 1 February 2020
Contents
Wednesday, February 5
- Last 24 hours
- Issues
- Reports
- Plans for today
Tuesday, February 4
- Last 24 hours
- Issues
- Reports
- Plans for today
Monday, February 3
- Last 72 hours
- Friday:
- No beam 10am-12pm (BLA calibration). Opportunistic Hall access
- No beam 4pm-9pm (lost vacuum in Hall C transport [1])
- Saturday:
- Friday:
- Changes
- Issues
- MCC sees our radiator IN & OUT at the same time [7]
- Reports
- Plans for today
- Production
Friday, January 31
- Last 24 hours
- Issues
- Reports
- More on initial PS enhancement [18]
- Plans for today
- We may (or may not) have ~30min for access at 10am
- Production
Thursday, January 30
- Last 24 hours
- Issues
- Reports
- Initial PS enhancement Spring 2020 [28]
- Plans for today
- Any more work on diamond alignment?
- Production