== Friday, Dec 6 at 08:45 == | == Friday, Dec 6 at 08:45 == | ||
# Last 24h: | # Last 24h: | ||
− | #* Collected enough straight track data for GEM at beam left, moved it to beam right during first access. | + | #* Collected enough straight track data for GEM at beam left, moved it to beam right during first access, then center. |
− | #* | + | #* GEM_TRD firmware updated between beam left and beam right running |
− | + | #* FADC replaced on GEM_TRD. Readout issues with GEM_TRD (see Lubomir's logentry). | |
#* [https://logbooks.jlab.org/entry/3747124 Hovanes disabled the alarms on two TOF channels which have faulty HV boards] | #* [https://logbooks.jlab.org/entry/3747124 Hovanes disabled the alarms on two TOF channels which have faulty HV boards] | ||
#Issues | #Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3747274 Lubomir's logentry, GEM_TRD] | ||
+ | #*[https://logbooks.jlab.org/entry/3747174 Beni, TOF] | ||
+ | #Reports | ||
+ | #* [https://logbooks.jlab.org/entry/3747185 Tim, PS field] | ||
# Plan for today | # Plan for today | ||
#* Empty target, ramp solenoid while Richard does tagger accidentals measurement | #* Empty target, ramp solenoid while Richard does tagger accidentals measurement |
Revision as of 20:54, 5 December 2019
<- Back to Run Coordination Meetings:Fall2019 Run
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 1
- Hall D schedule for week 2
- BTA guidelines
Thursday, Dec 5 at 08:45
- Last 24h:
- Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
- Sean got the general detector checkout done.
- Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
- Sasha set up trigger config for straight tracks excluding uscope so Richard can work independently
- Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
- Lubomir's logentry
- Issues
- Solenoid alarm
- PSS fault
- GEM cable or module swap
- Plan for today
- After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
- Move GEM to position 3, then take more data until ~6am Friday?
- Plan for later
- Alexandre's comprehensive runplan now at 3-4
- Notes from this meeting.
- Also need to check the GEM readout config
- Beam time request from David for CPP
- Radiation levels report from Alexandre
- Repeated alarms for TAGH 151
Friday, Dec 6 at 08:45
- Last 24h:
- Collected enough straight track data for GEM at beam left, moved it to beam right during first access, then center.
- GEM_TRD firmware updated between beam left and beam right running
- FADC replaced on GEM_TRD. Readout issues with GEM_TRD (see Lubomir's logentry).
- Hovanes disabled the alarms on two TOF channels which have faulty HV boards
- Issues
- Reports
- Plan for today
- Empty target, ramp solenoid while Richard does tagger accidentals measurement
- Fill target.
- CDC & TOF scans
- DIRC commissioning field-on
- Opp access request from Sasha 30 mins to replace fcal fadcs
- Plan for later
- Alexandre's comprehensive runplan now at #5
- Spin dance likely Monday or Tuesday. We can have beam for some of this time.
- Diamond alignment on Wednesday?
- Notes from this meeting.