Difference between revisions of "June 25, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 20: | Line 20: | ||
# Installation work: | # Installation work: | ||
#* Corrosion with optical box materials and removal | #* Corrosion with optical box materials and removal | ||
− | #** Steel alignment pins: [https://logbooks.jlab.org/entry/3691225 removal of top plate] and [ remaining 6 pins] | + | #** Steel alignment pins: [https://logbooks.jlab.org/entry/3691225 removal of top plate] and [https://logbooks.jlab.org/entry/3693360 remaining 6 pins] |
#** Aluminum optical fiber brackets | #** Aluminum optical fiber brackets | ||
#** LED fiber testing: [https://logbooks.jlab.org/entry/3689699 with rust coating] and [https://logbooks.jlab.org/entry/3689958 after cleaning] (Bill) | #** LED fiber testing: [https://logbooks.jlab.org/entry/3689699 with rust coating] and [https://logbooks.jlab.org/entry/3689958 after cleaning] (Bill) |
Revision as of 10:21, 25 June 2019
Meeting Information
GlueX DIRC Meeting
Tuesday June 25, 2019
1:00 pm, EDT
JLab Hall D
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Installation work:
- Corrosion with optical box materials and removal
- Steel alignment pins: removal of top plate and remaining 6 pins
- Aluminum optical fiber brackets
- LED fiber testing: with rust coating and after cleaning (Bill)
- Water testing results (Tim)
- Plans for remaining work for installation
- Cleaning mirrors (Greg)
- Test epoxy to prevent corrosion of exposed aluminum surfaces (Tim/All)
- Corrosion with optical box materials and removal
- Spring 2019 DIRC Commissioning Analysis (All)
- Reconstruction with FastDIRC (Yunjie)
- LUT improvements (Roman)
- Commissioning analyses (Ahmed)
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB