Difference between revisions of "Run Planning Meeting Notes, Apr 4 - Apr 10, 2019"
From GlueXWiki
(→Thursday, Apr. 4 at 08:45) |
|||
Line 26: | Line 26: | ||
#* Beam studies on Monday full 8 hrs. RF recovery if needed. | #* Beam studies on Monday full 8 hrs. RF recovery if needed. | ||
#* End of run in two weeks time... | #* End of run in two weeks time... | ||
+ | # AOB | ||
+ | |||
+ | == Friday, Apr. 5 at 08:45 == | ||
+ | # Notes from the past 24 hours | ||
+ | #* MCC reported issues with RF separators during the day shift (about 2 hours with no beam) | ||
+ | #* Collected more than 1.6B triggers on full target | ||
+ | # Issues | ||
+ | #* No FP trigger bit 6 since Wednesday's access ([https://logbooks.jlab.org/entry/3675468 logbook entry 3675468]). Fixed at 10:30 ([https://logbooks.jlab.org/entry/3675508 logbook entry 3675508]). | ||
+ | # Reports | ||
+ | #* AC y signal decay under beam follow up ([https://logbooks.jlab.org/entry/3675518 logbook entry 3675518]). | ||
+ | #* Convectron vacuum gauges alarms removed ([https://logbooks.jlab.org/entry/3675593 logbook entry 3675593]). | ||
+ | # Today | ||
+ | #* Production running, 200nA, 10<sup>-4</sup> Al | ||
+ | # Run Plan | ||
+ | #* Beam studies on Monday, the whole day shift. RF recovery only if needed. | ||
+ | #* End of run in 10 days | ||
# AOB | # AOB |
Revision as of 20:23, 4 April 2019
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Thursday, Apr. 4 at 08:45
- Notes from the past 24 hours
- Accesses
- MCC reported minor issues with RF separators last evening
- Collected more than 1.6B triggers on full target
- beam position was relatively stable
- Issues
- Reports
- Today
- Production running, 200nA, 10-4 Al
- Run Plan
- Beam studies on Monday full 8 hrs. RF recovery if needed.
- End of run in two weeks time...
- AOB
Friday, Apr. 5 at 08:45
- Notes from the past 24 hours
- MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
- Collected more than 1.6B triggers on full target
- Issues
- No FP trigger bit 6 since Wednesday's access (logbook entry 3675468). Fixed at 10:30 (logbook entry 3675508).
- Reports
- AC y signal decay under beam follow up (logbook entry 3675518).
- Convectron vacuum gauges alarms removed (logbook entry 3675593).
- Today
- Production running, 200nA, 10-4 Al
- Run Plan
- Beam studies on Monday, the whole day shift. RF recovery only if needed.
- End of run in 10 days
- AOB