== Monday, Apr. 1 at 08:45 == | == Monday, Apr. 1 at 08:45 == | ||
# Notes from the weekend | # Notes from the weekend | ||
+ | #* [https://logbooks.jlab.org/entry/3673930 Solenoid turbo pump] [https://logbooks.jlab.org/entry/3673904] | ||
+ | #* [https://logbooks.jlab.org/entry/3674023 Orbit and separator adjustments] | ||
+ | #* North Linac turbo pump | ||
# Issues | # Issues | ||
# Reports | # Reports | ||
# Today | # Today | ||
+ | #* Beam studies | ||
+ | #* Switch to Empty target | ||
# Run Plan | # Run Plan | ||
+ | #* When beam resumes, harp scans, then production running on empty target | ||
+ | #* Tuesday, RF recovery. Refill target | ||
+ | #* End of run in two weeks time... | ||
# AOB | # AOB | ||
+ | #* [https://logbooks.jlab.org/entry/3674100] | ||
== Sunday, Mar. 31 - No Meeting == | == Sunday, Mar. 31 - No Meeting == |
Revision as of 13:22, 31 March 2019
Contents
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Monday, Apr. 1 at 08:45
- Notes from the weekend
- Solenoid turbo pump [1]
- Orbit and separator adjustments
- North Linac turbo pump
- Issues
- Reports
- Today
- Beam studies
- Switch to Empty target
- Run Plan
- When beam resumes, harp scans, then production running on empty target
- Tuesday, RF recovery. Refill target
- End of run in two weeks time...
- AOB
Sunday, Mar. 31 - No Meeting
Saturday, Mar. 30 - No Meeting
Friday, Mar. 29 at 08:45
- Past 24 hours:
- North Linac problems day shift into swing (~3 hours)
- 4th pass separator, expect issues to continue for the next couple of shifts
- DAQ crash swing shift
- DAQ crash owl shift
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- Accesses(?)
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Switching back to empty target?
- End of run is coming...
Thursday, Mar. 28 at 08:45
- Past 24 hours:
- Pass change for hall C
- Separator issues, 4th and 5th pass
- Minor drifts in the Active Collimator lock
- Minor drifts in beam current
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
- Short interruption by MCC to continue investigation of separator issues from last night
- Run Plan
- Production running
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Switching back to empty target?