Difference between revisions of "Controls Meeting 21-Mar-2019"
From GlueXWiki
Line 4: | Line 4: | ||
* COMCAL issues (all) | * COMCAL issues (all) | ||
** Motorized stage upgrade? | ** Motorized stage upgrade? | ||
+ | * Wiener MPOD for PS/ST u1-10-top . | ||
* Remote resets (Hovanes) | * Remote resets (Hovanes) | ||
** Three VME crates used by OPS for our controls | ** Three VME crates used by OPS for our controls |
Latest revision as of 17:51, 20 March 2019
- Announcements
- Solenoid status (Tim,Beni)
- Magnet warmup
- COMCAL issues (all)
- Motorized stage upgrade?
- Wiener MPOD for PS/ST u1-10-top .
- Remote resets (Hovanes)
- Three VME crates used by OPS for our controls
- CAEN HV crates (halldcaenhv10 aka d2-8-mid)
- PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate
- DIRC plans
- Other business
Time/Location
10:00AM Thursday 21-Mar-2019 CC B101