# Today (Thursday): | # Today (Thursday): | ||
#* Remove Be foil @ 8 AM, but leave cylindrical holding tube. Lockup hall at ~1 pm | #* Remove Be foil @ 8 AM, but leave cylindrical holding tube. Lockup hall at ~1 pm | ||
− | #* Production running with no target until 6 am Friday morning | + | #* Production running with no target until 6 am Friday morning |
# Friday plan: | # Friday plan: | ||
#* LHe target installation: | #* LHe target installation: | ||
Line 26: | Line 26: | ||
# LHe target cooldown and filling schedule? | # LHe target cooldown and filling schedule? | ||
#* Chris expects ~10-12 hours required for cooldown. He would like to be here during the initial fill. | #* Chris expects ~10-12 hours required for cooldown. He would like to be here during the initial fill. | ||
− | #* Possible plan: Run warm empty target for few shifts, start cooldown over the weekend and fill on Monday? | + | #* Possible plan: Run warm empty target for few shifts, start cooldown over the weekend and fill on Sunday/Monday? |
Revision as of 09:32, 28 February 2019
Contents
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx-η run plan
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Thursday, Feb. 28 at 08:45
- Past 24 hours:
- Beam orbit locks off to allow Hall C current increase
- Unstable beam, lots of tuning to get high current for Hall A/C. 25 trips/hr average and will work to improve when they identify a path forward.
- Compton Production:
- 2.86 billion triggers with Be (Runs 61321-61344)
- 0.24 billion triggers with previous no target (Runs 61308-61311)
- Occupancy plots - Sasha
- Compton plot run 61322 - Drew
- Energy monitoring - Alexandre
- Today (Thursday):
- Remove Be foil @ 8 AM, but leave cylindrical holding tube. Lockup hall at ~1 pm
- Production running with no target until 6 am Friday morning
- Friday plan:
- LHe target installation:
- Hall open at 6 am for bleeding up beamline
- Other work in the Hall: start counter installation, others?
- LHe target installation:
- LHe target cooldown and filling schedule?
- Chris expects ~10-12 hours required for cooldown. He would like to be here during the initial fill.
- Possible plan: Run warm empty target for few shifts, start cooldown over the weekend and fill on Sunday/Monday?