Line 6: | Line 6: | ||
# Sasha adjusted CCAL LED trigger time delay https://logbooks.jlab.org/entry/3635382 | # Sasha adjusted CCAL LED trigger time delay https://logbooks.jlab.org/entry/3635382 | ||
# Production trigger rate study was performed by Sasha during afternoon and evening, https://logbooks.jlab.org/entry/3635399 | # Production trigger rate study was performed by Sasha during afternoon and evening, https://logbooks.jlab.org/entry/3635399 | ||
− | |||
# MCC plan for the coming week | # MCC plan for the coming week | ||
#* MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D). | #* MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D). | ||
Line 12: | Line 11: | ||
# Jay Benesch has initiated a discussion with a group of experts to investigate the feasibility of monitoring 1-2 nA beam current for Hall D. | # Jay Benesch has initiated a discussion with a group of experts to investigate the feasibility of monitoring 1-2 nA beam current for Hall D. | ||
# Tagger scaler distribution shows that we have beam leakage from Hall C. https://logbooks.jlab.org/entry/3635351 | # Tagger scaler distribution shows that we have beam leakage from Hall C. https://logbooks.jlab.org/entry/3635351 | ||
+ | # We have been taking Compton production data on LH2 target since midnight. |
Revision as of 09:19, 6 December 2018
Wed, Dec 5 at 8:45
- Several items were fixed during a controlled access in the morning
- Amorphous radiator ladder by Hovanes and Scot
- Colin replaced a few bad FCAL bases
- Sasha checked one noising CompCal channel and found out that it was caused by the FADC baseline
- Sasha adjusted CCAL LED trigger time delay https://logbooks.jlab.org/entry/3635382
- Production trigger rate study was performed by Sasha during afternoon and evening, https://logbooks.jlab.org/entry/3635399
- MCC plan for the coming week
- MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
- On Dec 9 (Monday), the beam will be off at 6:00am. MCC will change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).
- Jay Benesch has initiated a discussion with a group of experts to investigate the feasibility of monitoring 1-2 nA beam current for Hall D.
- Tagger scaler distribution shows that we have beam leakage from Hall C. https://logbooks.jlab.org/entry/3635351
- We have been taking Compton production data on LH2 target since midnight.