Difference between revisions of "Run Planning Meeting Notes, Nov 14-Nov 21, 2018"
From GlueXWiki
(→Thursday, Nov 15 at 08:45) |
(→Thursday, Nov 15 at 08:45) |
||
Line 20: | Line 20: | ||
#Issues | #Issues | ||
#* [https://logbooks.jlab.org/entry/3626278 CBrem gui not fitting] and [https://logbooks.jlab.org/entry/3626468 the coherent edge has been drifting]. Decided (6am) to stop run on diamond, do Harp scan and continue with amorphous run, then TAC until the problem is fixed. | #* [https://logbooks.jlab.org/entry/3626278 CBrem gui not fitting] and [https://logbooks.jlab.org/entry/3626468 the coherent edge has been drifting]. Decided (6am) to stop run on diamond, do Harp scan and continue with amorphous run, then TAC until the problem is fixed. | ||
− | #* [https://logbooks.jlab.org/entry/3626126 Convergence optimization failed]. [https://logbooks.jlab.org/entry/3626463 Rates after optimization did not show improvement.] | + | #* [https://logbooks.jlab.org/entry/3626126 Convergence optimization failed] because optics has drifted compared to yesterday, the basis for how to carry the optimization. [https://logbooks.jlab.org/entry/3626463 Rates after optimization did not show improvement.] |
#* [https://logbooks.jlab.org/entry/3626469 Beam current has been unusually unstable yesterday] [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367] | #* [https://logbooks.jlab.org/entry/3626469 Beam current has been unusually unstable yesterday] [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367] | ||
#Reports | #Reports |
Revision as of 07:05, 15 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Low energy running Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 9
- Hall D schedule for week 10
Thursday, Nov 15 at 08:45
- Last 24h:
- Standard production running
- Issues
- CBrem gui not fitting and the coherent edge has been drifting. Decided (6am) to stop run on diamond, do Harp scan and continue with amorphous run, then TAC until the problem is fixed.
- Convergence optimization failed because optics has drifted compared to yesterday, the basis for how to carry the optimization. Rates after optimization did not show improvement.
- Beam current has been unusually unstable yesterday [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367]
- Reports
- [ Monitoring] (Thomas)
- Plans
- TAC run this morning/afternoon. With V-wire
- Production running
- Notes